My WebLink
|
Help
|
About
|
Sign Out
Home
3B Public Hearing 2006 0905
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2006
>
Packet 2006 0905
>
3B Public Hearing 2006 0905
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2007 11:37:48 AM
Creation date
9/11/2006 12:34:49 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
9/5/2006
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />VI. MAINTENANCE <br /> <br />A. The project site shall be well maintained and shall be kept free of litter, debris and <br />weeds at all times. <br /> <br />B. Any graffiti shall be promptly removed from building walls and/or fences. The <br />developer and its successors in interest shall comply with the rules and regulations <br />of the City's graffiti removal program and shall grant a license and right of entry <br />as requested to enforce the terms of such program. <br /> <br />C. All landscaping improvements shall be maintained in a healthy, growing condition <br />at all times. Any trees by the sidewalks shall be maintained so as not to interfere <br />or obstruct the public right-of-way for pedestrians and vehicles. <br /> <br />D. Trash and recycle containers shall have designated areas, which shall be out of <br />public view, except on days that collection is required. <br /> <br />VII. CONSTRUCTION PROVISIONS <br /> <br />A. Construction activity shall not create dust, noise or safety hazards for adjacent <br />residents and properties. Dirt and mud shall not be tracked onto Darius Way from <br />the project site during construction. <br /> <br />B. Standard construction dust control procedures, such as wetting, daily roadwashing <br />and other maintenance functions to control emissions, shall be implemented at all <br />times during outdoor construction. Dust generating activities such as excavation, <br />paving etc., shall be scheduled the early morning and other hours when wind <br />speeds are low. <br /> <br />C. Procedures with the highest noise potential shall be scheduled for daylight hours, <br />when ambient noise levels are highest. <br /> <br />D. The contractor(s) shall be required to employ the quietest among alternative <br />equipment or to muffle/control noise from available equipment. <br /> <br />E. All construction contracts shall include the following requirements: 1) unpaved <br />construction sites shall be sprinkled with water at least twice per day; 2) trucks <br />hauling construction materials shall be covered with tarpaulins or other effective <br />covers; 3) streets surrounding demolition and construction sites shall be swept at <br />least once per day; and 4) paving and planting shall be done as soon as possible. <br />City shall charge developer, and developer shall pay, for all costs of sweeping city <br />streets in the vicinity of the project as necessary to control dust and spillage. <br /> <br />Revised Conditions of Approval <br />PLN2005-00063 <br /> <br />September 5, 2006 <br />Page 60f8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.