<br />(e) Subdivider agrees to take all steps necessary to mitigate the potential generation of air-borne <br /> <br />dust or debris during the perfolll1ance of the work hereunder. Subdividcr fUl1her agrees that thc City <br /> <br />Engmeer, as the sole and final Judge, may order all or any portion of the work to be suspended in the event <br /> <br />air-borne dust or debris leaves the work area and causes a nuisance to adjoining property owners or the <br /> <br />publIc at large. Such suspensions shall remain in effect until the City Engineer is fully satisfied that the <br /> <br />work practices causing the air-borne dust or have been satisfactorily mitigated and the adversely affected <br /> <br />properties or areas have been thoroughly cleaned. <br /> <br />(0 Construction activity for private street improvements shall not commence prior to 7:00 a.m. and shall <br /> <br />cease by 5 :00 p.m., Monday through Friday, and no work on Saturdays and Sundays, unless otherwise approved by <br /> <br />the City Engineer. Prior to working on Saturday and Sunday, the Subdivider's contractor shall inform the Engineer- <br /> <br />ing Inspector 48 hours in advance to schedule an inspection. All other non-private street improvement construction <br /> <br />activity, including the construction of homes, shall not commence prior to 7:00 a.m. and shall cease by 7:00 p.m. <br /> <br />Monday through Friday, and such construction activity shall not commence prior to 9:00 a.m. and shall cease <br /> <br />by 5:00 p.m. on Sunday and Saturday. No construction is permitted on Federal holidays. <br /> <br />(g) Truck hauling activities shall be restricted to 8:00 a.m. to 5:00 p.m. There shall be no truck hauling <br /> <br />Activity on Saturdays, Sundays and legal holidays. <br /> <br />(h) The contractor shall be required to employ the quietest among alternative equipment or to <br /> <br />mume/control noise from available equipment. <br /> <br />(i) Insofar as possible, noisy operations shall be performed off-site or on portions of the site <br /> <br />distant from residential neighborhoods. <br /> <br />(j) All construction contracts shall include the following requirements: I) Unpaved <br />construction sites shall be sprinkled with water at least twice per day, 2) tnlcks hauling construction <br />materials shall be covered with tarpaulins or other effective covers, 3) streets surrounding demolition and <br />construction sites shall be swept at least once per day, and 4) paving and planting shall be done as soon as <br />possible. City shall charge applicant, and applicant shall pay, for all costs of sweeping city streets in the <br />vicinity of the project as necessary to control dust and spillage. <br />(k) All construction contracts shall include requirements that construction equipment avoid <br /> <br />unnecessary idlmg to reduce CO, ROO and NO, emissions. <br /> <br />~ <br /> <br />TRACT MAP 757<) <br />S{JBDlVlSlON IMPROVEMENT AGREEMENT- <br />G:\_I.D\ Tract Map & Parcel Map\TM7579.WASl-lINGTON & springlakclSUBIMPAGR <br /> <br />.doc PAGE 14 OF 16 <br />