Laserfiche WebLink
<br />Resolution No. 2006-032 <br />Attachment B <br />Page 1 of I <br /> <br />TDA Article 3 Project Application Form <br /> <br />Fiscal Year of this Claim: 06/07 Applicant: Citv of San Leandro <br /> <br />Contact person: Keith R. Cooke <br /> <br />MailinQ Address: 835 East 14th Street. San Leandro, CA 94577 <br /> <br />E-Mail Address: kcooke@ci.san-Ieandro.ca.us Telephone: (510) 577-3439 <br /> <br />Secondarv Contact (in event primarv not available) Tara Peterson <br /> <br />E.Mail Address: toeterson@cLsan-leandro.ca.us Telephone: (510) 577-3432 <br /> <br />Short Title Description of Proiect: Citvwide Pedestrian Improvements <br /> <br />Amount of claim: $79.724 <br /> <br />Functional Description of Project: <br />Proiect will Qfovlde for the desiAn. construction and inspection of curb ramps. sidewalk bulb-outs. in-pavement liahted crosswalk. pedestrian safetv <br />slanaae. accessible oedestrian traffic sianal eauioment and sidewalks at various locations throuahout City. <br /> <br />Financial Plan: <br />List the project elements for which TOA funding is being requested (e.g., planning, environmental, engineering, right-of-way, construction, <br />inspection, contingency, audit). Use the table below to show the project budget. Include prior and proposed future funding of the project. If the <br />project is a segment of a larger project, include prior and proposed funding sources for the other segments. <br /> <br />Proiect Elements: Enaineerina. Construction and Inspection <br /> <br />Funding Source All Prior FYs Application FY Next FY Following FYs Totals <br />TDA Article 3 $79,724 $79,724 <br />list all other sources: <br />1. <br />2. <br />3. <br />4. <br />Totals <br /> <br />Project Eligibility: YES?/NO? <br />A. Has the project been approved by the claimant's governing body? (If "NO," provide the approximate date approval is Yes <br /> anticipated). <br />B. Has this project previously received TDA Article 3 funding? If "YES," provide an explanation on a separate page. No <br />C. For "bikeways," does the project meet Caltrans minimum safety design criteria pursuant to Chapter 1000 of the California N/A <br /> Highway Design Manual? (Available on the internet via: htto:/Iwww.dot.ca.Qov). <br />D. Has the project been reviewed by a Bicycle Advisory Committee? (If "NO," provide an explanation). N/A <br />E. Has the public availability of the environmental compliance documentation for the project (pursuant to CEQA) been N/A <br /> evidenced by the dated stamping of the document by the county clerk or county recorder? (required only for projects that <br /> include construction). <br />F. Will the project be completed before the allocation expires? Enter the anticipated completion date of project (month and Yes <br /> year) June 2008 <br />G. Have provisions been made by the claimant to maintain the project or facility, or has the claimant arranged for such Yes <br /> maintenance by another agency? (If an agency other than the Claimant is to maintain the facility provide its name: <br /> ) <br />