Laserfiche WebLink
<br />EXHIBIT A <br /> <br />SCOPE OF SERVICES <br /> <br />Description <br />This CSA is for the preparation of construction documents for renovation to existing playfields <br />at the Bancroft Middle School in San Leandro, California. <br /> <br />The projects improvements covered under this contract comprise all items necessary to bid and <br />construct the proposed playfield improvements as shown in the approved concept plan <br />(Drawing A I) below; including but not limited to the following: <br />. Demolition and site preparation <br />. New asphalt service driveway and coating of basketball courts. <br />. Screening fence <br />. New turf play fields (artificial turf or sod with sand-slit drainage system) <br />. New synthetic fitness track <br />. Storm drainage system <br />. Irrigation system <br />. Landscape improvements <br />. Utility service connections (water / power) as needed. <br /> <br /> <br />t." .~ <br />,~~ . '<.Ill <br />....- - <br /> <br />BANCROFT MIDDLE SCHOOL FIELDS <br />San Leandro Unified School District, City of San Leandro <br /> <br />DrawinlZ: Ai: Proiect Concept Plan <br /> <br />FINAL CONCEPT~~ .~7- <br />....... _eo....... <br />:== <br /> <br />Bancroft Middle School Playfields <br />Project No. 210-38-257 <br /> <br />October 25, 2006 <br />Page 16 of24 <br />