Laserfiche WebLink
<br />MINUTES NO. 89-22 <br /> <br />Page 7 of 7 <br /> <br />November 9, 1989 <br /> <br />that there are problems, the City Engineer can prohibit further development. <br /> <br />Nelson: It extends beyond the permit process. Even after permits are issued, <br />the development will be watched closely. <br /> <br />Hesseltine: Asked if it is determined that the mitigation is uneconomical or <br />unfeasible, the parcel would then not be developed. <br /> <br />Riback: Yes. <br />