My WebLink
|
Help
|
About
|
Sign Out
Home
3A Public Hearing 2006 1204
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2006
>
Packet 2006 1204
>
3A Public Hearing 2006 1204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2007 11:34:50 AM
Creation date
12/1/2006 10:50:58 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
12/4/2006
Retention
PERM
Document Relationships
_CC Agenda 2006 1204
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2006\Packet 2006 1204
MO 2006-044
(Reference)
Path:
\City Clerk\City Council\Minute Orders\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />GEOTECNIA <br />Project Number: 060805 <br />2888 Darius Way, San Leandro <br />October 27,2006 <br /> <br />Page 10 <br /> <br />If groundwater is encountered during pier shaft drilling, it should be removed by pumping, or the <br />concrete must be placed by the tremie method. The tremie pipe should be extended to the <br />bottom of the pier hole and kept below the top of the concrete in the hole as the hole is filled <br />with concrete in order for the concrete to displace the water upward. If the pier holes are dry, the <br />concrete should not be dropped more than 5 feet vertically to avoid segregation of the cement <br />mix and the aggregate, which would weaken the concrete. Mushrooming of the concrete at the <br />tops of the piers should be prevented. <br /> <br />Shallow Footings <br /> <br />The portions of the structures (including retaining walls) in level areas underlain by bedrock <br />north of the access road may be supported on shallow spread and continuous footing <br />foundations, provided the footings are at least 10 feet from any downslope. The spread footings <br />should be at least 15 inches wide and extend at least 18 inches below the lowest adjacent finished <br />grade or 12 inches into the bedrock, whichever is deeper. The geotechnical engineer should <br />check the footing excavations, prior to placing any steel reinforcement, to evaluate the <br />appropriate depth for. the actual earth materials encountered. <br /> <br />Spread footings should be designed for maximum allowable soil contact pressures of 3,000 <br />pounds per square foot (pst) for dead loads, 3,600 psffor dead plus sustained live loads, and <br />4,500 psffor total loads, including wind and seismic forces. We anticipate that footings <br />designed and constructed in accordance with our recommendations will experience total <br />settlements less than % inch and differential settlements less than Yz inch over a 25-foot span. <br /> <br />Footing excavations without vertical sides, as well as the above-grade portions of the footings, <br />should be formed to prevent overpours and mushrooming of concrete. The finished footings <br />should have vertical sides. <br /> <br />Resistance to lateral loads can be obtained using an allowable passive pressure equivalent to that <br />provided by a fluid weighing 350 pounds per cubic foot (pct), and a base friction coefficient of <br />0.35 multiplied by the net vertical dead load. These values include a safety factor of 1.5, and <br />may be used in combination without reduction. Passive pressure for any keys extending below <br />the bottoms of footings may be calculated using a uniform passive pressure of 1,500 psf, <br />provided they are excavated neatly into undisturbed bedrock. <br /> <br />Retainine Walls <br /> <br />Static Loads <br /> <br />The lateral earth pressure criteria below assume that the backfill materials within the "active <br />zone" are - ilnport. non-expansive granular fill material (select backfill) instead of the in-situ <br />clays. The active zone includes the entire volume above an imaginary plane inclined at 60 <br />degrees above horizontal from a point one foot behind the bottom of the back of the heel of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.