My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2006 Diversified Developers Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2006
>
Agmt 2006 Diversified Developers Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2007 10:46:50 AM
Creation date
12/15/2006 4:53:59 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/17/2006
Retention
PERM
Document Relationships
Reso 2006-087
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />air-borne dust or debris leaves the work area and causes a nuisancc to adjoining property owners or thc <br /> <br />public at large. Such suspensions shall remain in effcct until thc City Enginecr is fully satisfied that the <br /> <br />work practices causing the air-borne dust or have becn satisfactorily mitigated and the adversely affected <br /> <br />propertics or areas have bcen thoroughly cleaned. <br /> <br />(1) Construction activity for public improvements shall not commencc prior to 8:00 a.m. and <br /> <br />shall cease by 5:00 p.m., Monday through Friday, and no work on Saturdays and Sundays, unless otherwise <br /> <br />approved by the City Engineer. Prior to working on Saturday and Sunday, the Subdivider's Contractor shall <br /> <br />infonn the Engineering Inspector 48 hours advance to schedule an inspection. There shall be no <br /> <br />construction activity on Sundays and legal holidays. Interior construction such as sheet rock taping and <br /> <br />texturing, painting, tile installation and similar activity shall be permitted outside the abovc working hours <br /> <br />provided that construction noise shall not be detectable outside of the new homes being built. <br /> <br />(g) Truck hauling activities shall be restricted to 8 a.m. -- 3:30 p.m. There shall be no truck <br /> <br />hauling activity on Saturdays, Sundays and legal holidays. <br /> <br />(h) The contractor shall be required to employ thc quietest among alternative equipment or to <br /> <br />muffle/control noise from available equipment. <br /> <br />(i) Insofar as possible, noisy operations shall be performcd off-site or on portions of the site <br /> <br />distant from rcsidential neighborhoods. <br /> <br />(j) All construction contracts shall include the following requirements: 1) Unpaved <br />construction sites shall be sprinkled with water at least twice per day, 2) tTucks hauling constTUction <br />materials shall be covered with tarpaulins or other effective covers, 3) streets surrounding demolition and <br />constmction sites shall be swept at Icast once per day, and 4) paving and planting shall be done as soon as <br />possible. City shall charge applicant, and applicant shall pay, for all costs of sweeping city streets in the <br />vicinity of the project as necessary to control dust and spillage. <br />(k) All constTLlction contracts shaH include requirements that construction equipment avoid <br />unnecessary idling to reducc CO, RaG and NOx emissions. <br />(I) To the extent possible, construction activities, including vehicles and workers, shall be <br />excluded from sensitive habitat areas throughout the construction period. Temporary fencing shall be <br />installed along the border between the developmcnt and the sensitive habitat areas and shall be posted with <br />signs clearly stating that all constmction vchicles and workers are prohibited from entering the sensitive <br />TRACT MAP 7497 <br />SUflDlVISION IMPROVEMENT AGREEMENT <br />n\LO\_Tract Map & Parcel Map\TM7497-915 Lewelling Blvd\SUflIMP.AUR.doc PAGE 14 OF 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.