My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2006 Brown and Caldwell
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2006
>
Agmt 2006 Brown and Caldwell
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2007 4:13:50 PM
Creation date
1/23/2007 4:13:47 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
10/2/2006
Retention
PERM
Document Relationships
Reso 2006-112
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Task 6-100 percent Design Submittal- WPCP Electrical Upgrades. This task includes the <br />following elements: <br />· Incorporate City's 70 percent design comments. <br />· Prepare documents for City's final review. <br />· Submit project to San Leandro Building Department, obtain and respond to conm1ents. <br />· Develop 100 percent design level engineer's opinion of probable construction cost. A <br />construction contingency of 10 percent will be used for this level. <br />· Submit five copies of plans, specifications, and estimate for City review. <br />· Submit memo or letter from QA/QC person indicating that documents are ready to be bid <br />and constructed. <br /> <br />Task 7-100 percent Design Submittal- Waste Activated Sludge Thickening Upgrades and <br />Primary Effluent Flow Equalization Improvements. This task includes the following elements: <br />· Incorporate City's 70 percent design comlnents. <br />· Prepare docun1ents for City's final review. <br />· Sublnit project to San Leandro Building Department, obtain and respond to con1illents. <br />· Develop 100 percent design level engineer's opinion of probab Ie construction cost. A <br />construction contingency of 10 percent will be used for this level. <br />· Subn1it five copies of plans, specifications, and estimate for City review <br />· Submit n1emo or letter from QA/QC person indicating that documents are ready to be bid <br />and constructed. <br /> <br />Task 8-Bid Documents - WPCP Electrical Upgrades. This task includes the following <br />elements: <br />· Incorporate City and Building Departn1ent comments. <br />· Provide specifications and full size (24-inches by 36-inches) vellum drawings, both <br />stamped and signed, to City to reproduce Bid Documents. <br /> <br />Task 9-Bid Documents - Waste Activated Sludge Thickening Upgrades and Primary <br />Effluent Flow Equalization Improvements. This task includes the following elements: <br />· Incorporate City and Building Department comments. <br />· Provide specifications and full size (24-inches by 36-inches) vellum drawings, both stamped <br />and signed, to City to reproduce Bid DOCUlnents. <br /> <br />Task 1000Bid Period Services - WPCP Electrical Upgrades. This task includes providing bid <br />period services including pre-bid Ineeting and preparing addenda. <br /> <br />Task II-Bid Period Services - Waste Activated Sludge Thickening Upgrades and Primary <br />Effluent Flow Equalization Improvements. This task includes providing bid period services <br />including pre-bid meeting and preparing addenda. <br /> <br />City Provided Items. We have assumed that the following items will be provided or completed by <br />the City: <br /> <br />WPCP Electrical, WAS, Flow EQ <br />593-52-225 <br /> <br />Page 18 of24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.