My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes 2003 0721
CityHall
>
City Clerk
>
City Council
>
Minutes
>
2003
>
Minutes 2003 0721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2007 5:05:49 PM
Creation date
1/23/2007 5:05:46 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minutes
Document Date (6)
7/21/2003
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />IVIINUTES Page 9 <br />City of San Leandro City Council and San Leandro Redevelopment Agency Joint Meeting-July 21, 2003 <br /> <br />proceedings for the acquIsItIon of a pOliion of the property at 15555 Hesperian <br />Boulevard for road widening). <br /> <br />· Conduct a Property Owners' Hearing as Required by Law. <br /> <br />· Resolution No. 2003-171, Resolution of Necessity Determining that the Public <br />Interest and Necessity Require the Acquisition of Certain Land and Directing the <br />Filing of En1inent Domain Proceedings for a Portion of the Property Located at <br />15555 Hesperian Boulevard, Assessor's Parcel No. 413-0003-001-03, Property <br />Owners: S.J. Cuttitta and Wells Fargo Bank, N.A., Pauline Freschi, Paula Kamena <br />and Lenore F. Maionchi, for Road Widening. (2957) <br /> <br />Q. Resolution No. 2003-172, Resolution Approving Plans and Specifications and <br />Authorizing the Call for Bids for Target Sign Relocation, Hesperian Boulevard and <br />Lewelling Boulevard Widening, ACTIA Project No. 17, Project No. 144-39-002 <br />(provides for relocating the existing Target sign approximately 20' west of its current <br />location). Funding: Approved as Part of the Fiscal Year 2002-03 CIP Budget, 100% <br />Reimbursable through Measure B. (2957) <br /> <br />R. Resolution No. 2003-173, Resolution Approving Contractual Services Agreement with <br />BKF Engineers Relating to the MacArthur Boulevard Streetscape Project, Project Nos. <br />964-82-058 and 964-82-046 (provides for additional engineering design services). <br />Cost: $263,448. Funding: Redevelopment Agency Funds. (2323) <br /> <br />S. Resolution Approving Contractual Services Agreement with Collaborative Design <br />Architects, Inc. Relating to the New Bookstore and Retail Area in the Main Library, <br />Project No. 210-38-225 (provides design services for a new bookstore and retail area in <br />the Main Library, approximately 600 square feet). Cost: $40,664. Funding: <br />Miscellaneous Engineering Study, Approved by the City Manager in 2003. (Moved to <br />Item 9. Items Removed from Consent Calendar.) (2323) <br /> <br />T. Resolution No. 2003-174, Resolution Approving Contractual Services Agreement with <br />Safe Moves Relating to the PedestrianlBicycle Safety Program, Project No. 120-38-176 <br />(provides for Elementary School Workshops, Community-based Traffic Rodeos and <br />Senior Citizen Traffic Safety Presentations). Cost: $64,700. Funding: Approved in <br />Fiscal Year 2002-03 Budget. (2323) <br /> <br />U. Resolution No. 2003-175, Resolution Approving Contractual Services Agreement with <br />Concept Marine Associates Relating to the Rebuild the Fuel Dock Project, Project No. <br />597-57-197 (provides for preparation of plans and specifications for construction). <br />Cost: $61,200. Funding: Approved as Part of the Fiscal Year 2001-02 Budget. (2323) <br /> <br />V. Resolution Approving Contractual Services Agreement with Glass Architects Relating <br />to the Washington Manor Park Pool Renovation, Project No. 210-62-002 (provides for <br />design services related to the removal and renovation of existing aquatic facilities). <br />
The URL can be used to link to this page
Your browser does not support the video tag.