My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2007-014
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2007
>
Reso 2007-014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2007 10:26:02 AM
Creation date
2/22/2007 10:25:57 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
2/20/2007
Retention
PERM
Document Relationships
8F Consent 2007 0220
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2007\Packet 2007 0220
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SAN LEANDRO <br />Initial Study/Negative Declaration <br /> <br />Boat Launch Ramp Facility Relocation <br />San Leandro Marina <br /> <br />The City of San Leandro finds that no significant effect on the environment, as prescribed by the <br />California Environmental Quality Act (CEQA) of 1973, as amended, will occur for the following <br />proposed proj ect: <br /> <br />Project Location: <br /> <br />The proposed project site is located on Mulford Point Drive within the San Leandro Marina on <br />the San Francisco Bay, in the City of San Leandro. The Marina is accessible from Marina <br />Boulevard via the 1-880 Freeway. <br /> <br />The project proponent/lead agency is the City of San Leandro at: <br />Engineering and Transportation Department <br />835 East 14th Street <br />San Leandro, California 94577 <br /> <br />CMA, a Division of TranSystems Corporation is acting as the environmental documentation <br />contact for the lead agency at: <br />180 Grand Avenue, Suite 400 <br />Oakland, California 94612 <br /> <br />General Plan Designation: <br /> <br />General Commercial (project is consistent) <br /> <br />Zoning: <br /> <br />Commercial Recreation (project is consistent) <br /> <br />Project Description: <br /> <br />Launch Ramp: <br /> <br />Remove the existing wood pier at the new launch ramp site, approximately 3,650 square feet; <br />pennanently remove approximately 26 treated timber support piling at the pier; fill <br />approximately 450 cubic yards at the pier location; remove and replace approximately 200 cubic <br />yards of rip rap at pier location.; cut approximately 270 cubic yards at new launch ramp <br />location; place approximately 6,000 square feet of cast-in-place and pre-cast concrete launch <br />ramp (approximately 4,000 square feet of which will be below Mean High Water - MHW) at the <br />new location, along with approximately 150 cubic yards of protective rip rap. <br />
The URL can be used to link to this page
Your browser does not support the video tag.