Laserfiche WebLink
<br />Emergency Operation Center <br /> <br />· Senior Center EOC <br /> <br />- Layout works well <br /> <br />- Single Floor <br /> <br />- Storage dedicated to EOC required <br />. 250 sf building addition <br />. 250 sf loft space <br /> <br />- Back-up Power Needed <br /> <br />- Telecommunications upgrade needed <br /> <br />- Costs $750K to $1.3M for upgrade <br /> <br /> <br />EMERGENCY OPERATIONS CENTER <br /> <br />Outstanding Issues / Questions <br /> <br />. Exterior Appearance of Structure <br /> <br />. Extent to which EOC components should <br />be included in the Building <br /> <br />· Questions <br /> <br />6 <br />