Laserfiche WebLink
<br />(c) The contractor shall be required to employ the quietest among alternative equipment or to <br /> <br />muffle/control noise from available equipment. <br /> <br />(d) Insofar as possible, noisy operations shall be performed off-site or on portions of the site <br /> <br />distant from residential neighborhoods. <br /> <br />(e) All construction contracts shall include the following requirements: 1) Unpaved <br />construction sites shall be sprinkled with water at least twice per day when instructed by the inspector, 2) <br />trucks hauling construction materials shall be covered with tarpaulins or other effective covers, 3) streets <br />surrounding demolition and construction sites shall be swept at least once per day, and 4) paving and <br />planting shall be done as soon as possible. City shall charge applicant, and applicant shall pay, for all costs <br />of sweeping city streets in the vicinity of the project as necessary to control dust and spillage. <br />(f) All construction contracts shall include requirements that construction equipment avoid <br />unnecessary idling to reduce CO, ROG and NOx emissions. <br />(g) To the extent possible, construction activities, including vehicles and workers, shall be <br />excluded from sensitive habitat areas throughout the construction period. Temporary fencing shall be <br />installed along the border between the development and the sensitive habitat areas and shall be posted with <br />signs clearly stating that all construction vehicles and workers are prohibited from entering the sensitive <br />habitat areas. Fencing and signage shall be installed prior to issuance of any building permits. Whenever <br />necessary to ensure the protection of sensitive habitat areas the City may employ at applicant's expense <br />consultants to inspect the construction staking and construction activity. <br />(h) Subdivider's responsibility for the treatment, management, or disposal of hazardous <br />substances, hazardous wastes or hazardous materials (collectively, "Hazardous Substances") shall be no <br />greater than nor less than that provided by and under federal, state and regional law (as may be implemented <br />under local law). Notwithstanding the foregoing, Subdivider agrees to be responsible for the disposal of the <br />soil and other material extracted from those roadway excavation by Subdivider during construction of the <br />"required improvements" provided for herein, whether or not such excavation contain Hazardous <br />Substances. Subdivider shall agree to be responsible for any additional conditions imposed by any other <br />regulatory agency to the extent those conditions are necessary for the removal of the excavated soils and or <br />the replacement of the removed soil, so long as such conditions do not require Subdivider to remediate any <br />Hazardous Substances beyond the area ofthe project. <br /> <br />PARCEL MAP 9307 - SUBDIVISION IMPROVEMENT AGREEMENT <br />C:\Work\Plants\San Leanclro\SUB IMP AGR PM 9307.doc <br /> <br />PAGE 13 OF 14 <br />