Laserfiche WebLink
<br />EXHIBIT A <br /> <br />SCOPE OF SERVICES <br /> <br />This contract is to provide additional professional services to assist the City with <br />construction support for the Effluent Irrigation Project at the Monarch Bay Golf <br />Complex. The scope includes responding to request for information (RFls), reviewing <br />submittals, conducting periodic site observations, providing startup engineering support, <br />and preparing record drawings. This scope and contract amount is in addition to the <br />previous contract services agreement signed by Kennedy/Jenks Consultants on February <br />2, 2007. <br /> <br />Task 1 - Construction Support - Office Services <br />During the construction phase, Consultant shall provide office support services to the <br />City which are as follows: <br />· Review Requests for Information (RFls): RFls submitted to the Contractor will be <br />reviewed and necessary guidance will be provided to the Contractor on the <br />interpretation of Contract Documents. An additional 20 RFls are included in the <br />scope of services. Effort is estimated at 5 hours per review <br />· Submittal Reviews: Consultant shall review data submitted by the Contractor to <br />verify that they conform to the contract Documents. An additional 20 submittals <br />and resubmittals are included in the scope of services. Effort is estimated at 3 <br />hours per review. <br />· Change Orders: Consultant shall prepare, if necessary, Change Orders to modify <br />the contract as necessary as requested by the City. Two (2) Change Orders are <br />included in the scope of services. Effort is estimated at 20 hours per Change <br />Order. <br />· Record Drawings: Consultant shall prepare Record Drawings based on <br />information (Sketches, Clarifications and Change Orders) furnished by the <br />Contractor and City personnel. One full set of drawings shall be provided to the <br />City along with an electronic copy prepared in Portable Document Format (pdt). <br />Effort is estimated at 3 hours per sheet with 25 sheets anticipated. <br /> <br />Task 2 - Construction Support - Field Services <br />During the construction phase, Consultant shall provide field support services to the City <br />which are as follows: <br />· Site Observation: The Project Manager or office engineers assigned to the project <br />shall visit the construction site for purpose of performing specialized inspections, <br />coordinating work and/or milestone inspection, or to perform other mutually <br />agreed upon work. An additional four (4) 4 -hr visits are anticipated for the <br />Project Manager or other office engineers assigned to the project <br />· Geotechnical Field Support: Fugro, as a sub consultant, shall provide geotechnical <br />field observations and limited on-site testing. Periodic status reports of the <br />geotechnical shall be developed by Fugro as required in the contract documents <br /> <br />Wastewater Treatment Plant Effluent Irrigation <br />Project No. 593-52-219 <br /> <br />February 20, 2007 <br />Page 15 of 19 <br />