My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2007112318
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2006
>
Inst 2007112318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2007 9:06:51 AM
Creation date
4/5/2007 9:06:49 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/6/2006
Recorded Document Type
Agreement to Conditions
Retention
PERM
Document Relationships
Inst 2010382452
(Amended by)
Path:
\City Clerk\City Council\Recorded Documents\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />D. The applicant shall prepare a construction truck route plan that would restrict <br />trucks to arterial streets that have sufficient pavement section to bear the heavy <br />truck traffic, thereby minimizing noise and traffic impacts to the community. The <br />construction truck route plan shall be reviewed and approved by the City <br />Engineering and Transportation Department prior to receipt of the grading permit. <br /> <br />E. Truck hauling activities shall be restricted to 8:00 a.m. to 5:00 p.m., unless <br />otherwise approved by the City Engineer. There shall be no truck hauling activity <br />on Saturdays, Sundays and Federal holidays. <br /> <br />F. Procedures with the highest noise potential shall be scheduled for daylight hours, <br />when ambient noise levels are highest. <br /> <br />G. The applicant shall require contractor(s) to employ the quietest equipment or, if <br />not alternative is available, to muffle/control noise from available equipment. <br /> <br />H. All construction contracts shall include the following requirements: 1) Unpaved <br />construction sites shall be sprinkled with water at least twice per day; 2) Trucks <br />hauling construction materials shall be covered with tarpaulins or other effective <br />covers; 3) Streets surrounding demolition and construction sites shall be swept at <br />least once per day; and 4) Paving and planting shall be done as soon as possible. <br />City shall charge developer, and developer shall pay, for all costs of sweeping <br />city streets in the vicinity of the project as necessary to control dust and spillage. <br /> <br />I. The property shall be secured during demolition and construction with a six (6) <br />foot tall chain link fence and any other security measures in accordance with <br />recommendation of the San Leandro Police Department. <br /> <br />x. POLICE DEPARTMENT REQIDREMENTS <br /> <br />A. The applicant shall submit typical details and specifications for the security of the <br />drive-up facility, including security cameras of other surveillance devices; details <br />subject to the review and approval of the San Leandro Police Department. <br /> <br />B. All building addresses shall be placed in such a position as to be plainly visible <br />and legible from the street. Said numbers shall contrast with their background <br />and be visible at night. Details including number size and location shall be <br />submitted for the review and approval of the Alameda County Fire Marshal and <br />the Chief Building Official, prior to issuance of building permits. Specific <br />property addresses will be assigned by the Building and Safety Services Division <br />of the Community Development Department. <br /> <br />XI. GENERAL REQIDREMENTS <br /> <br />A. Prior to the issuance of any building permits, applicant shall pay any applicable <br />school mitigation fees as determined by the San Leandro Unified School District. <br /> <br />Conditions of Approval <br />PLN2005-00112 <br /> <br />March 2, 2006 <br />Page 9 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.