Laserfiche WebLink
<br />SAN LEANDRO ADMINISTRATIVE CODE <br /> <br />TITLE 6 <br />Chapter 4 <br /> <br />2007-08 <br />Proposed <br /> <br />FINANCE <br />Fees <br /> <br />~6.4. I 00: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative <br />Code (SLAC) or the general laws of the State of Cali fomi a <br /> <br />Descri tion <br /> <br /> <br />2. Permit <br />a. Issuance Fee <br /> <br />c. Satellite Dish Antenna <br /> <br />d. Minor Kitchen Remodel Permit: <br />(Limited to work without framing changes.) <br /> <br />e. Plan <br /> <br />Current Fee <br /> <br /> <br />FY 07..()8 Pro osed <br /> <br />Division <br /> <br />Same as for other <br /> <br /> <br />minimum <br /> <br /> <br /> <br />a. Single kitchen or bath remodel (permit to include <br />electrical, plumbing, mechanical ventilation and <br />appliances) $363.00 <br />b. Additional bath remodel when concurrent with kitchen or <br />bath remodel within the same structure and at same time <br />$128.00 <br /> <br />c. Single kikhen or bath remodel (permit <br />to include electrical, plumbing, <br />mechanical ventikItion and appliances) <br />$374.00 <br />d. Additional bath remodel when <br />concu"ent with kikhen or bath remodel <br />within the same structure and at same <br /> <br /> <br />Plan checking fee shall be paid at the time of application for a building permit. The plan checking fee is in addition <br />to the fee and shall be as follows: <br /> <br /> <br />For Master Plans (i.e. identical buildings <br />built by the same builder on the same lot or <br />in the same tract and for which building <br />are issues at the same tin1~): . <br /> <br />Changes, revisions, or additions to plans <br />checked. <br /> <br /> <br />Cost <br /> <br />5/14/2007 <br /> <br />80% of the <br /> <br />fee <br /> <br />A full plan checking fee shall be paid for each Master Plan <br />when more than one building will be built and one half (50%) <br />of the full plan checking fee shall be paid for each building at <br />time <br /> <br />Direct Cost(1) <br /> <br />8 <br />