Laserfiche WebLink
<br />2000 Settlement Ae:reement between the Port of Oakland and the City of San Leandro <br />Element Status <br />San Leandro Runway Use Policy - Except for This policy is still in effect. <br />emergency landings or when the South Field is <br />closed for construction, regularly scheduled <br />large or heavy commercial passenger aircraft <br />operations shall not occur from the North Field <br />over San Leandro. <br />Insulation of 200 homes * First 10 homes (Introductory Phase) completed <br /> Phase I - 77 homeowners participating in this <br /> phase - homes have been surveyed and <br /> participation documents have been signed <br /> Phase II - 43 homeowners are eligible from the <br /> original lottery for this phase; 70 slots-are <br /> available to complete the project. <br />Insulation of Mulford-Marina Branch Library A sound study indicated the noise levels during <br />if noise levels meet an agreed upon threshold. library hours were well below the agreed upon <br /> threshold. <br />Safety Issues - The Port and City shall work The Port continues to invite the City, the San <br />cooperatively on emergency preparedness and Leandro Police Department and the Alameda <br />community education outreach programs. County Fire Department to observe andlor <br /> participate in all of its emergency exercises and <br /> strategic emergency planning discussions. <br />Relocation of the Instrument Landing System In the November 2004 Addendum to the <br />(1LS) at the North Field agreement, the City agreed to allow the Port to <br /> make the determination as to whether or not <br /> the ILS for runway 27-right should be moved <br /> to 27-left or should be augmented with the <br /> addition of a new ILS for 27-left. <br />North Field Flight Route Research Group The North Field group continues to meet on a <br />continuation regular basis to study and discuss noise related <br /> matters. <br />Port Aviation Committee to meet quarterly The two Committees continue to meet. <br />with the City's Airport Committee <br /> <br />* In addition to the 200 homes to be insulated, the City Attorney negotiated on behalf of the San <br />Leandro and San Lorenzo Unified School districts for the insulation of Muir, Wilson, Monroe, <br />Garfield, and Corvallis schools. The San Leandro schools have been insulated; Corvallis will be <br />insulated as part of a larger upcoming capitol improvement project. <br /> <br />2003 Addendum to the ettlement Aueement <br />Element Status <br />Port release of funds to begin the insulation The funds have been available for payments <br />program for the insulation program since the program <br /> consultants (C. Kell-Smith) were hired. <br /> <br />S <br />