Laserfiche WebLink
<br />SAN LEANDRO ADMINISTRATIVE CODE <br /> <br />2007 -08 <br />Proposed <br /> <br />TITLE 6 <br />Chapter 4 <br /> <br />FINANCE <br />Fees <br /> <br />~6.4.1 00: FEES. The following fees have been established by the City CmUlcil pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative <br />Code (SLAC) or the general laws of the State of California. <br /> <br /> Description Current Fee Reference FY 07-08 Proposed <br /> INITY .... Division <br /> IUD'''.! .MEJ'IIl- w~...... <br />4. <- <br /> For steam or hot water heating piping and <br /> radiators, convectors, hot water panels, steam or <br /> hot water unit heaters, clothes pressing machines <br /> of any type, and all connection to industrial and <br /> Minimum fee ,'" , $8.00 $8.25 <br /> Each additional device $9.75 $10.45 <br /> Boilers: <br /> To 3 h.p.. each $14.00 $14.40 ~ ~ ~ ~ <br /> Over 3 to 15 h p., each $20.75 $24.35 <br /> Over 15 to 30 I.P., each $26.50 $27.30 <br /> Over 30 to 50 I.P.. each $40.25 $41.45 . <br /> Over 50 h.p., each $67.00 $69.00 <br /> -- --^ ,- ----^- ___0___"_""" ~ . <br /> Solar system, including collectors, piping, tanks and $41.50 $42.75 : <br /> , <br /> . each system <br /> Energy Conservation: review of plans and/or energy Direct Cost (1) with a minimum charge of$54.00 Direct Cost (1) with a minimum charge of <br /> forms for all buildings subject to the California Energy $56.00 <br /> Commission's conservation regulations (when not <br /> covered v; permit) <br /> .r <br /> ....... <br /> <br />5/14/2007 <br /> <br />18 <br />