My WebLink
|
Help
|
About
|
Sign Out
Home
11C2a 2007 0702
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2007
>
Packet 2007 0702
>
11C2a 2007 0702
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2007 9:52:51 AM
Creation date
6/29/2007 9:52:50 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/2/2007
Retention
PERM
Document Relationships
MO 2007-069
(Reference)
Path:
\City Clerk\City Council\Minute Orders\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AC Transit East Bay Bus Rapid Transit DEIS/EIR Comments <br />6/29/2007 <br /> <br />4 <br /> <br />Land Use Impacts <br /> <br />The City has concerns about land use impacts within the study corridor through San Leandro. <br />Major infrastructural improvements were implemented as a result of the MTC-funded and <br />award-winning East 14th Street South Area Development Strategy, would be substantially <br />affected by the installation of dedicated bus lanes from Blossom Way to the Bay Fair BART <br />station. <br /> <br />Additionally, there are six City of San Leandro official planning areas, as described in the San <br />Leandro General Plan, including one not mentioned in the DEIS/EIR, the E. 14th Street <br />Commercial Corridor, that are located along or intersected by the study corridor and that will <br />therefore be impacted by construction of the BRT project. Merchants and business owners <br />within the transit corridor will be adversely impacted during the construction phase of the <br />project, as well as after project implementation. The DEIS/EIR does not identify any <br />mitigation regarding potential impacts to business owners along this important commercial <br />corridor. <br /> <br />Additionally, impacts on Bancroft Avenue land uses due to diversion of vehicular traffic from <br />E. 14th Street onto Bancroft Avenue have not been evaluated. <br /> <br />Environmental Justice Impacts <br /> <br />The DEIS/DEIR describes traffic disruption to local business "during construction" and that <br />the "major adverse effects ofthe project are temporary." However, minority or low-income <br />populations are clustered along the study corridor and will be adversely impacted, as described <br />above, after project implementation, and not just during the construction phase of the project. <br /> <br />Noise Impacts <br /> <br />Noise impacts to land uses, where dedicated lanes would displace vehicular traffic to other <br />streets parallel to the alignment have not been included in the noise analysis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.