My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2007228918
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2007
>
Inst 2007228918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2007 9:34:03 AM
Creation date
7/23/2007 9:33:58 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
1/18/2007
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Leandro's Environmental Services Division. Said containers shall be stored inside <br />the garage with the exception of the designated pick-up days by the disposal <br />company. <br /> <br />VIII. CONSTRUCTION PROVISIONS <br /> <br />A. Construction activity shall not commence prior to 7:00 a.m. and shall cease by <br />7:00 p.m. Monday through Friday, and construction activity shall not commence <br />prior to 9:00 a.m. and shall cease by 5:00 p.m. on Saturday and Sunday. No such <br />construction is permitted on Federal holidays. As provided in this City of San <br />Leandro's Noise Ordinance (ORDINANCE NO. 2003 - 005), "construction" shall <br />mean any site preparation, assembly, erection, substantial repair, alteration, <br />demolition or similar action, for or on any private property, public or private right- <br />of-way, streets, structures, utilities, facilities, or other similar property. <br />Construction activities carried on in violation of this Article may be enforced as <br />provided in Section 4-11-1130, and may also be enforced by issuance of a stop <br />work order and/or revocation of any or all permits issued for such construction <br />activity. <br /> <br />B. Construction activity shall not create dust, noise or safety hazards for adjacent <br />residents and properties. Dirt and mud shall not be tracked onto Washington <br />Avenue from the project site during construction. <br /> <br />C. Standard construction dust control procedures, such as wetting, daily roadwashing <br />and other maintenance functions to control emissions, shall be implemented at all <br />times during outdoor construction. Dust generating activities such as grading, <br />excavation, paving etc., shall be scheduled the early morning and other hours <br />when wind speeds are low. All construction activities entailing soil disturbance <br />shall cease when winds exceed 30 miles per hour as an hourly average. <br /> <br />D. The developer shall prepare a construction truck route plan that would restrict <br />trucks to arterial streets that have sufficient pavement section to bear the heavy <br />truck traffic, thereby minimizing noise and traffic impacts to the community. The <br />construction truck route plan shall be reviewed and approved by the City Traffic <br />Engineer prior to receipt of the grading permit. <br /> <br />E. Truck hauling activities shall be restricted to 8:00 a.m. to 5:00 p.m. There shall be <br />no truck hauling activity on Saturdays, Sundays and legal holidays. <br /> <br />F. Procedures with the highest noise potential shall be scheduled for daylight hours, <br />when ambient noise levels are highest. <br /> <br />G. The contractor(s) shall be required to employ the quietest among alternative <br />equipment or to muffle/control noise from available equipment. <br /> <br />H. All construction contracts shall include the following requirements: 1) Unpaved <br />construction sites shall be sprinkled with water at least twice per day; 2) Trucks <br /> <br />Agreement to Conditions <br />PLN2006-00043 <br /> <br />January 18, 2007 <br />Page 7 ofl3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.