My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2007-101
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2007
>
Reso 2007-101
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2007 5:08:34 PM
Creation date
7/23/2007 5:08:34 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
7/16/2007
Retention
PERM
Document Relationships
8I Consent 2007 0716
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2007\Packet 2007 0716
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Central Alameda County <br />Freeway System <br /> <br />Financially Unconstrained <br />LATIP Project List <br /> <br /> <br /> <br />Financially Unconstrained <br />LATIP Project List <br /> <br />A Widen connector, NB 1-23B to NB I-BBO <br />B Washington & Lewelling IC <br />C Extend I-BBO HOV North to Hegenberger <br />o Add I-BBO aux. lanes, A St. to Winton <br />E Add NB off-ramp, I-BBO to Industrial <br />F Add I-BBO aux. lanes, <br />Industrial to Whipple <br />G Whipple IC Truck Improvements <br />H On-ramp modifications (locations TBD) <br />I Adaptive ramp metering (corridor-wide) <br />J Integrated Corridor Management (ICM) <br />K I-BBO/Davis IC improvement <br />L I-BBO/Marina IC improvement <br />M I-BBO/A St.IC improvement <br />N I-BBO/Winton IC improvement <br />o SR 92/lndustriallC improvement <br />P Strobridge/I-SBO improvements <br />Q Redwood/I-S80 IC funding <br />R 1-880/SR 92 reliever- <br />Clawiter/WhiteselllC <br />Reduce ramp merge/weave conflicts <br />(locations T8D) <br />T Managed lanes (locations T8D) <br />U Soundwalls (locations T8D) <br /> <br />1 1-238 Widening <br />2 Redwood Rd. IC <br />3 Route 92/1-880 IC <br />4 Lewelling Widening <br />5 5R-238 Downtown <br />Loop/Corridor <br />6 West A 5t Extension <br />7 Whitesell 5t Extension <br />8 Tennyson Extension <br />9 Marina Blvd Widening <br />10 1-880 5B HOV Lane Extension <br />from Hegenberger Rd. to <br />Marina Blvd. <br /> <br />o <br />~ <br />g <br /> <br />""i"d Complete by 2015 <br />Complete by 2030 <br /> <br />Reviswndaft: 06.]5.07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.