My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2007 0730
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2007
>
Packet 2007 0730
>
8F Consent 2007 0730
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2007 4:16:51 PM
Creation date
7/27/2007 4:16:45 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/30/2007
Retention
PERM
Document Relationships
_CC Agenda 2007 0730
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2007\Packet 2007 0730
Reso 2007-107
(Reference)
Path:
\City Clerk\City Council\Resolutions\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Key components of the Mitigation Monitoring and Reporting Program for the proposed retail <br />and mixed-use residential project will identify in a table: <br /> <br />· The mitigation measures to be implemented by development phase (e.g., during final <br />design, during construction, and long-term during occupancy) <br /> <br />· The entity responsible for implementing a particular measure <br /> <br />· The entity responsible for verifying that a particular measure has been completed <br /> <br />· A monitoring milestone(s) or action(s) to mark implementation/completion of the <br />mitigation measure <br /> <br />· Recommendations for reporting monitoring actions or for noting <br />implementation/completion of a measure. <br /> <br />This document is a preliminary version and will be modified if the Planning Commission <br />recommends certification of the FEIR. At that time, the measures in the Mitigation Monitoring <br />and Reporting Program will be revised to reflect the actual measures recommended for inclusion <br />by the Planning Commission. <br /> <br />Task 7. Water Supply Assessment and Water Supply Verification <br /> <br />SB 610 and SB 221, passed into law in 2001, reflect the growing awareness of the need to <br />incorporate water supply and demand analysis at the earliest possible stage in the land use <br />planning process. <br /> <br />SB 610 amends the statutes of the Urban Water Management Planning Act. As a result of SB <br />610, water assessments must be furnished to local governments for inclusion in any <br />environmental documentation for projects meeting the specified requirements under 9 10912 (a) <br />of the Water Code and subject to CEQA. Under this section, a "project" means any of the <br />following: a residential development with 500 or more dwelling units; a retail center employing <br />more than 1,000 persons or having more than 500,000 square feet of floor space; a commercial <br />building employing more than 1,000 persons or having more than 250,000 square feet of office <br />space; a hotel or motel with more than 500 rooms; a mixed-use project with one or more of these <br />elements; or a project creating the equivalent demand of 500 residential units. In addition, if a <br />public water system has less than 5,000 service connections, then a project also means any <br />proposed residential, business, commercial, hotel or motel, or industrial development that would <br />account for an increase of 10 percent or more in the number of service connections. The <br />proposed project meets these requirements, and therefore a Water Supply Assessment (WSA) is <br />required for the project under SB 610. <br /> <br />A Water Supply Verification is triggered by a sub-division of 500 units under the Subdivision <br />Map Act 966473.7 Both the WSA and the WSV must analyze water supply and demand over a <br />20 year planning horizon under various drought scenarios. The WSV goes a step further and <br />requires water supplies must be currently available or permits and funding have been secured. <br />This Project does not require a new tentative map and therefore will not require a Wsv. <br /> <br />Consulting Services Agreement between <br />City of San Leandro and EIP Associates <br /> <br />Page 37 of43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.