Laserfiche WebLink
<br /> <br />Project Highlights <br /> <br />~jHjUitJrM~_t <br />. Design and construct new signal equipment <br />. Install signal interconnect <br />. Reconfigure intersection <br />. Remove pork-chop island at southeast corner <br />. Relocate PG&E utility pole <br />. Repair sidewalk at the southwest corner <br />. Modify curb at southeast corner <br />. Install new handicap ramps at all four corners <br /> <br /> <br />HSIP Grant Status <br /> <br />., Ltl_ <br />. April 2007 - grant application <br />. June 2007 - grant approval for <br />$419,220 <br />. October 2007 - design <br />. July 2008 - construction <br /> <br />6 <br />