Laserfiche WebLink
<br />FOCUSING OUR VISION (FOCUS) PROGRAM <br />Application for Priority Development Area Designation <br /> <br /> <br />Part 6 - POTENTIAL ASSISTANCE REQUESJEO(check a'fthatapply) <br />Note: Assistance is not being offered at this.time. This informationwUl.aidthe development ofa <br />tools and incentives package for designated areas. <br /> <br />TECHNICAL ASSISTANCE <br /> <br />o Assistance with policies to <br />implement existing plan <br />o Assistance with photo- simulations <br />to depict future conditions <br />o Assistance with local workshops <br />and tours <br />o Other: <br /> <br /> <br /> <br />REQUEST FOR PLANNING GRANTS <br /> <br />o Funding for new area-wide specific <br />plan or precise plan <br />o Funding to update existing area- <br />wide specific plan or precise plan <br />o Funding for EIR to implement <br />existing area-wide plan <br />o Other: <br />1) Funding for Planning Study of <br />specific Station access <br />improvements at San Leandro <br />BART Station: Reduction of lane <br />width from 7 to 5 lanes on San <br />Leandro Blvd. (SLB), introduction of <br />on-street parking on SLB between <br />Davis and Williams, pedestrian <br />crossings of SLB at West Juana <br />Ave., West Joaquin Ave. and Parrot <br />St., re-orientation of BART bus and <br />kiss-and ride areas; <br />2) Prepare an infrastructure study for <br />sanitary sewer and storm drain <br />systems and adopt a downtown <br />improvement district which funds <br />improvements for storm water and <br />sewer facilities to accommodate <br />growth in the downtown. Adopt Fee <br />Analysis for improvements <br />identified in the infrastructure study. <br /> <br /> <br />REQUEST FOR CAPITAL GRANTS. <br /> <br />o Funding for transportation projects <br />(including pedestrian/bicycle) <br />o Funding for housing projects <br />o Funding for water/sewer capacity <br />o Funding for parks/urban greening <br />o Funding for streetscape <br />improvements <br />o Other: 1. Arterial Streetscape <br />Improvements on San Leandro <br />Blvd., E. 14th St. and Davis St. 2. <br />BART Station Improvement - Kiss <br />and Ride Lot, Bicycle way-finding <br />and lockers. 3. BART Replacement <br />Parking Structure. 4. Callan <br />Parking Lot Expansion. 5. <br />Downtown to BART Pedestiran <br />Connection Improvements on W. <br />Juana Ave, Parrot St., Hays St., <br />including dynamic pricing Parking <br />Meters. 6. Eastbay Greenway <br />(BART Bikeway, linear Park). 7. <br />Pedestrian Creek Crossings at <br />Pershing and Harrison. 8. Bicycle <br />Plan Update. 9. Improvement <br />funds for Rte 185 (East 14th St) and <br />Rte 112 (Davis St.) relinquishment. <br />10. Car Share Vehicles and <br />Facilities. 11. Railroad Pedestrian <br />and Bicycle Grade Separations. <br />12. West of BART Streetscape and <br />Connectivity Improvements. <br />· If any box checked, Part 7 applies. <br /> <br />Part.7..~'.INFAASTR.~~~~f;~~~c.;t;JF~Il'p$IC)RlnAREA <br />(If.pptiC:a~tJ{;t"f.I'''~~fq'!) <br /> <br />If you are interested in capital grants as a potential incentive, please attach a budget that details the types of infrastructure <br />improvements that will be needed in order to realize the vision for the priority area. This budget can include transportation, <br />housing, road repairs, water/sewer capacity, parks and other critical amenities. A sample budget is provided for guidance. <br /> <br />If submitting an infrastructure budget is not feasible at this time, please note why: <br /> <br />Page 4 of5 <br /> <br />April 2007 <br />