Laserfiche WebLink
107.2 Conformance. <br />Temporary structures and uses shall conform to the structural strength, fire safety, means of <br />egress, accessibility, light, ventilation and sanitary requirements of this code as necessary to <br />ensure public health, safety and general welfare. <br />107.3 Temporary power. <br />The building official is authorized to give permission to temporarily supply and use power in <br />part of an electric installation before such installation has been fully completed and the final <br />certificate of completion has been issued. The part covered by the temporary certificate shall <br />comply with the requirements specified for temporary lighting, heat or power in the Electrical <br />Code. <br />] 07.4 Termination of approval. <br />The building official is authorized to terminate such permit for a temporary structure or use and <br />to order tre temporary structure or use to be discontinued. <br />SECTION 108 <br />FEES <br />108.] Payment of fees. <br />A permit shall not be valid until the fees prescribed bylaw have been paid, nor shall an <br />amendment to a permit be released until the additional fee, if any, has been paid. <br />Fees shall be assessed for permits and associated plan review in accordance with the San <br />Leandro Fire Code and the fee schedule established by the San Leandro City Council as set forth <br />in Chapter 4 of the San Leandro Administrative Code. <br />108.2 Permit fees. <br />1. General: Fees shall be assessed in accordance with the provisions of this section. <br />2. Permit Fees: The fee for each permit shall be as set forth in this section. The <br />determination of value or valuation under any of the provisions of this Coda shall be <br />made by the building official. The value to be used in computing the building permit and <br />building plan review fees shall be the total value of all construction work for which the <br />permit is issued as well as all finish work, painting, roofing, electrical, plumbing, heating, <br />air conditioning, elevators, fire-extinguishing systems and other permanent equipment. <br />3. Plan Review Fees: When submittal documents are required by Section 106.1, a plan <br />review shall be paid at the time of submitting the submittal documents for plan review. <br />Said plan review fee shall be eighty percent (SO%) of the building permit fee as set forth <br />in the applicable fee schedule resolution adopted by the city council. <br />The plan review fees specified in this subsection are separate fees from the permit fees <br />specified in Section 108.2(b) and are in addition to the permit fees. <br />When submittal documents are incomplete or changed so as to require additional plan <br />review or when the project involves deferred submittal items as defined in Section <br />13 <br />