Laserfiche WebLink
109.3.5 Lath and gypsum board inspection. <br />Lath and gypsum board inspections shall be made after lathing and gypsum board, interior and <br />exterior, is in place, but before any plastering is applied ar gypsum board joints and fasteners are <br />taped and finished. <br />109.3.6 Fire-resistant penetrations. <br />Protection of joints and penetrations in fire-resistance-rated assemblies shall not be concealed <br />from view until inspected and approved. <br />109.3.7 Energy efficiency inspections. <br />Inspections shall be made to determine compliance with Title 24, Part 6 and shall include, but <br />not be Limited to, inspections for: envelope insulation R and U values, fenestration U value, duct <br />system R value, and HVAC and water-heating equipment efficiency. <br />109.3.8 Other inspections. <br />In addition to the inspections specified above, the building official is authorized to make or <br />require other inspections of any construction work to ascertain compliance with the provisions of <br />this code and other laws that are enforced by the division of building and safety services. <br />109.3.9 Special inspections. <br />For special inspections, see Section 1704. <br />109.3.]0 Final inspection. <br />The final inspection shall be made after all work required by the building permit is completed. <br />109.4 inspection agencies. <br />The building official is authorized to accept reports of approved inspection agencies, provided <br />such agencies satisfy the requirements as to qualifications and reliability. <br />109.5 Inspection requests. <br />It shall be the duty of the holder of the building permit or their duly authorized agent to notify <br />the building official when work is ready for inspection. It shall be the duty of the permit holder <br />to provide access to and means for inspections of such work that are required by this code. <br />109.6 Approval required. <br />Work shall not be done beyond the point indicated in each successive inspection without first <br />obtaining the approval of the building official. The building official, upon notification, shall <br />make the requested inspections and shall either indicate the portion of the construction that is <br />satisfactory as completed, or notify the permit holder or his or her agent wherein the same fails to <br />comply with this code. Any portions that do not comply shall be corrected and such portion shall <br />not be covered or concealed until authorized by the building official. <br />16 <br />