My WebLink
|
Help
|
About
|
Sign Out
Home
Ord 2007-022
CityHall
>
City Clerk
>
City Council
>
Ordinances
>
2007
>
Ord 2007-022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2007 2:47:51 PM
Creation date
11/7/2007 2:47:28 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Ordinance
Document Date (6)
11/5/2007
Retention
PERM
Document Relationships
3A Public Hearing 2007 1105
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2007\Packet 2007 1105
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
109.3.7 Energy efficiency inspections. <br />Inspections shall be made to determine compliance with Title 24, Part 6 and shall include, but <br />not be limited to, inspections for: envelope insulation R and U values, fenestration U value, duct <br />system R value, and HVAC and water-heating equipment efficiency. <br />109.3.8 Other inspections. <br />In addition to the inspections specified above, the building official is authorized to make or <br />require other inspections of any construction work to ascertain compliance with the provisions of <br />this code and other laws that are enforced by the division of building and safety services. <br />109.3.9 Special inspections. <br />For special inspections, see Section 1704. <br />109.3.10 Final inspection. <br />The final inspection shall be made after all work required by the building permit is completed. <br />109.4 Inspection agencies. <br />The building official is authorized to accept reports of approved inspection agencies, provided <br />such agencies satisfy the requirements as to qualif cations and reliability. <br />109.5 Inspection requests. <br />It shall be the duty of the holder of the building permit or their duly authorized agent to notify <br />the building official when work is ready for inspection. It shall be the duty of the permit holder <br />to provide access to and means for inspections of such work that are required by this code. <br />109.6 Approval required. <br />Work shall not be done beyond the point indicated in each successive inspection without first <br />obtaining the approval of the building official. The building official, upon notification, shall <br />make the requested inspections and shall either indicate the portion of the construction that is <br />satisfactory as completed, or notify the permit holder or his or her agent wherein the same fails to <br />comply with this code. Any portions that do not comply shall be corrected and such portion shall <br />not be covered or concealed until authorized by the building official. <br />SECTION 110 <br />CERTIFICATE OF OCCUPANCY <br />110.1 Use and occupancy. <br />No building or structure shall be used or occupied, and no change in the existing occupancy <br />classification of a building or structure or portion thereof shall be made until the building official <br />has issued a certificate of occupancy therefor as provided herein. Issuance of a certificate of <br />occupancy shall not be construed as an approval of a violation of the provisions of this code or of <br />other ordinances of the jurisdiction. <br />ORDINANCE NO. 2007-022 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.