Laserfiche WebLink
H. Applicant shall remove any broken and uplifted sidewalk, driveway, curb and <br />gutter along the full project frontage and shall construct new City standard <br />sidewalk driveway, curb and gutter in the same location and alignment as the <br />existing curb and gutter. Applicant shall remove any unused driveways and <br />construct new City standard sidewalk, curb and gutter in the same location and <br />alignment as the existing sidewalk, curb and gutter and shall construct City of San <br />Leandro standard commercial driveway approaches. <br />I. Construct all public and pedestrian facilities in accordance with current <br />Americans with Disabilities Act (ADA) requirements, including curb ramps and <br />truncated domes. Repair and/or replace any deficient improvements such as raised <br />sidewalk, cracked concrete sidewalks, damaged curb and gutter to comply with <br />current ADA requirements or as directed by the City Engineer prior to acceptance <br />of improvements. <br />J. The Developer is also responsible for ensuring that all contractors and <br />subcontractors are aware of and implement all storm water quality measures. Failure <br />to comply with the approved construction BMPs shall result in the issuance of <br />correction notices, citations and/or a prof ect stop order. <br />K. No construction materials and/or equipment shall be stockpiled or parked within the <br />City right-of--way. <br />L. Roof drains shall discharge to an unpaved area wherever practicable. <br />M. During any construction activity the following high standards for sanitation are <br />required: Garbage cans, construction dumpsters, and debris piles shall be removed <br />on a minimum weekly basis. All food related trash items such as wrappers, cans, <br />bottles, and food scraps shall be disposed of in closed containers only and shall be <br />regularly removed from the site. Inspections, conducted as part of the regular <br />construction compliance, will be conducted to ensure compliance of the Applicant <br />and contractors with this requirement. <br />N. Construction activity in the City public right-of--way shall not commence prior to <br />8:00 a.m. and shall cease by 5:00 p.m., Monday through Friday, unless otherwise <br />approved in writing by the City Engineer. There shall be no construction activity on <br />Saturdays, Sundays or City, federal, or state holidays in the City public right-of--way. <br />4. The applicant shall coordinate all facility adjustments, relocations, or additions to <br />utility services with the appropriate utility companies. <br />P. The location of all outdoor, above-ground and/or at-grade pad mounted <br />transformers, utility equipment, vaults, irrigation control boxes, back flow <br />prevention devices, and the like shall be subject to approval by the Community <br />Development Director and the City Engineer prior to the issuance of the first <br />project permit. Such equipment shall be painted forest green or a similar color and <br />Agreement to Conditions October 16, 2006 <br />PLN2006-00031 Page 8 of 15 <br />