Laserfiche WebLink
E. Prior to approval of the final building plans for building permits, the <br />developer shall submit evidence that all residences comply with Title 24 <br />Code, to the satisfaction of the Building Official. <br />F. All house plans shall be engineered by a registered structural engineer <br />retained by the developer. To minimize the risk of damage to any <br />development from strong ground shaking during an earthquake, structures <br />shall be constructed using the site-specific provisions of the most recent <br />construction code enforced by the City. <br />G. The developer shall employ the engineer responsible for the structural <br />design, or another engineer designated by the engineer responsible for the <br />structural design, to perform structural observation in accordance with the <br />building code. Structural observation means the visual observation of the <br />structural system, for general conformance to the approved plans and <br />specifications at significant construction stages and at completion of the <br />structural system. <br />H. Final building plans submitted for building permit shall incorporate a <br />range of water conservation measures to substantially reduce average per <br />capita daily use. These measures shall include the use of equipment, <br />devices and methods for plumbing fixtures and irrigation that provide for <br />long-term efficient water use, subject to the review and approval of the <br />Community Development Director. <br />VI. FENCING AND SCREENING REQUIREMENTS <br />A. All fencing and walls on the project site shall be structurally sound, <br />graffiti-free and well maintained at all times. <br />B. Barbed or razor wire shall not be installed on any fence, wall or building <br />on the project site. <br />C. Any electrical transformers shall be vaulted underground. Ll the event that <br />the transformer cannot be undergrounded, it shall be screened from view <br />consistent with the access requirements of PG&E. Details for screening <br />shall be subject to the review and approval of the Community <br />Development Director. <br />VII. MAINTENANCE <br />A. The project site shall be well maintained and shall be kept free of litter, <br />debris and weeds at all times; during construction, the site shall be well <br />maintained and shall be kept free of litter, debris and weeds. <br />B. Any graffiti shall be promptly removed from building walls, and/or fences. <br />The developer and its successors in interest shall comply with the rules <br />and regulations of the City's graffiti removal program and shall grant a <br />license and right of entry as requested to enforce the terms of such <br />program. <br />PLN2005-00141 Page 10 of 14 <br />Conditions of Approval September 5, 2006 <br />