Laserfiche WebLink
D. Upon demolition or removal of existing structures and improvements, the site <br />shall be enclosed with a security fence and shall be well maintained in a neat <br />manner, free of weeds, litter and debris. <br />VIII. CONSTRUCTION PROVISIONS <br />A. Construction activity shall not commence prior to 7:00 a.rn. and shall cease by <br />7:00 p.m. Monday through Friday, and construction activity shall not commence <br />prior to 9:00 a.m. and shall cease by 5:00 p.m. on Sunday and Saturday. No such <br />construction is permitted on Federal holidays. As provided in this City of San <br />Leandro's Noise Ordinance (ORDINANCE NO. 2003 - 005), "construction" shall <br />mean any site preparation, assembly, erection, substantial repair, alteration, <br />demolition or similar action, for or on any private property, public or private right- <br />of-way, streets, structures, utilities, facilities, or other similar property. <br />Construction activities carried on in violation of this Article may be enforced as <br />provided in Section 4-11-1130, and may also be enforced by issuance of a stop <br />work order and/or revocation of any or all permits issued for such construction <br />activity. <br />B. Construction activity shall not create (unreasonable amount) dust, noise or safety <br />hazards for adjacent residents and properties. Dirt and mud shall not be tracked <br />onto Washington Avenue, Springlake Drive, or Ian Street from the project site <br />during construction. Note in parenthesis is for clarification. <br />C. Standard construction dust control procedures, such as wetting, daily roadwashing <br />and other maintenance functions to control emissions, shall be implemented at all <br />times during outdoor construction. Dust generating activities such as grading, <br />excavation, paving etc., shall be scheduled the early morning and other hours <br />when wind speeds are low. All construction activities entailing soil disturbance <br />shall cease when winds exceed 30 miles per hour as an hourly average. <br />D. The developer shall prepare a construction truck route plan that would restrict <br />trucks to arterial streets that have sufficient pavement section to bear the heavy <br />truck traffic, thereby minimizing noise and traffic impacts to the community. The <br />construction truck route plan shall be reviewed and approved by the City Traffic <br />Engineer prior to receipt of the grading permit. <br />E. Truck hauling activities shall be restricted to 8:00 a.m. to 5:00 p.m. There shall be <br />no truck hauling activity on Saturdays, Sundays and legal holidays. <br />F. Procedures with the highest noise potential shall be scheduled for daylight hours, <br />when ambient noise levels are highest. <br />G. The contractor(s) shall be required to employ the quietest among alternative <br />equipment or to muffle/control noise from available equipment. <br />Agreement to Conditions June 6, 2005 <br />PLN2004-00101 Page 15 of 29 <br />