Laserfiche WebLink
13. All "found monuments" shall be tied by survey and described with tag numbers and <br />recorded references. Two found monuments of Record (approved. by Engineering <br />and Transportation Department) shall appear in a statement and be labeled in each <br />sheet of the map. A monument line shall be shown in all sub-division streets with <br />monument set in right-of--way. Elevation shall be shown on at least one monument <br />disk or Permanent Corner set to Datum City of San Leandro with X,Y, Z, NAVD88 <br />14. If the design of any site improvement requires encroachments onto neighboring <br />properties during construction, written agreements with that property owner shall be <br />submitted to the City Engineer, for review and approval, prior to approval of the <br />Final Map for that phase. <br />15. This vesting tentative map is a general plan of development. All details of <br />construction, including, but not limited to, on-site pavement slopes, pavement <br />section design, illumination, drainage, etc., are subject to the approval of the City <br />Engineer. <br />16. All T.V. Cable facilities shall be located and installed in accordance with the <br />City's "Design and Construction Standards for Ground-Mounted T.V. Cable <br />Facilities." <br />17. No street paving for any streets with existing public sanitary sewer mains and/or <br />storm drains shall be constructed unless and until any required rehabilitation <br />and/or upsizing of the mains have been completed. <br />18. Prior to the issuance of building permits for the project, the Subdivider shall <br />obtain an Encroachment Permit from the Engineering and Transportation <br />Department for any work within the public right-of--way on Washington Avenue. <br />19. Prior to the recordation of the final map with the Alameda County Recorder, <br />Subdivider shall submit to the City Engineer a computer disk with a file of the <br />points and lines of the final map in an AutoCAD-readable format compatible with <br />the City's Automated Mapping System. <br />B. STREETS <br />1. The City's Senior Transportation Engineer must approve all street widths and <br />sections within the project boundary. <br />2. Subdivider shall remove any substandard curb, gutter and sidewalk, along the full <br />project frontage on Washington Avenue, and shall construct new City standard <br />curb, gutter and sidewalk in the same location and/or alignment as the existing <br />concrete improvements or as required for street improvements. A valley gutter is <br />not allowed at the intersection of Washington Avenue and new street. <br />Agreement to Conditions June 6, 2005 <br />PLN2004-00101 Page 20 of 29 <br />