Laserfiche WebLink
Evaluation of Aquatic Facilities <br />City of San Leandro <br />San Leandro High School <br />produce sufficient velocity to impart a substantial circulatory movement to the pool <br />water. <br />Saw cut existing pool structure and install floor returns. <br />(Estimated Cost: $27,000.00) <br />Exhibit 24: Pool Surface Delamination <br />5. The San Leandro High School Pool area does not have domestic water connections <br />available as required by Title 24, chapter 31B: <br />3117E Hose Bibbs. Hose bibs shall be provided for each pool and located so that all <br />portions of the pool deck may be reached with a 75 foot length of hose attached to the <br />hose bib. Hose bibs shall be located so that they do not constitute a safety hazard and <br />shall be protected against backJlow. <br />Additional hose bibs should be added to the pool to meet the minimum standard as noted <br />above. These hose bibs can be added when the pool deck is being replaced, which will <br />provide easy access to run the domestic water piping to the appropriate locations. <br />(Estimated Cost $2,500.00) <br />6. The current flow rate of the pool water is at a rate that is somewhere between eight to ten <br />hours in violation of Title 24, Chapter 31B: <br />3124E Turnover Time. The recirculation and purification system shall have <br />sufficient capacity to provide a complete turnover ofpool water in: <br />v. One-half hour or less for a spa pool. <br />November 2001 Aquatic Design Group, Inc. <br />