My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2008 0219
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2008
>
Packet 2008 0219
>
8F Consent 2008 0219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2008 10:48:56 AM
Creation date
2/15/2008 10:48:55 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
2/19/2008
Retention
PERM
Document Relationships
_CC Agenda 2008 0219
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2008\Packet 2008 0219
Reso 2008-018
(Reference)
Path:
\City Clerk\City Council\Resolutions\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />Background <br />Utilizing information from the 1995 Sanitary Sewer Master Plan and video investigation <br />inspections, the Engineering and Transportation Department previously compiled and <br />categorized a list of sewer projects to be completed. Existing sewer mains are located both in the <br />public Right of Way and on private property. The scope of this contract is related to the <br />repair/rehabilitation to sewer mains located on private property at the following four locations: <br />1. Breed Ave /Beverly Ave <br />2. Dutton Ave / Broadmoor Blvd <br />3. View Drive <br />4. Cleveland Street <br />Improvements to locations 3 and 4 are already developed to 70% completion <br />Scope <br />1. Provide Topographic survey at locations 1 and 2 to determine the precise location of the <br />sewer mains and to document any and all above ground improvements that may hinder <br />repair/rehabilitation <br />2. Review video inspection data <br />3. Discuss improvement options to locations 1 & 2 and prepare preliminary <br />repair/rehabilitation plan <br />4. Develop the preliminary plan into construction drawings <br />5. Prepare construction Specifications in City's standard format using, and in accordance <br />with the Standard Specifications for Public Works, 2006 edition <br />6. Calculate quantities and prepare cost estimate <br />7. Construction support services -provided on an as-directed basis including: <br />a. Assistance through bidding, preparation of addenda, attend pre-bid conference <br />b. Interpret construction documents, review shop drawings, RFPs and other <br />contractor submittals <br />c. Observe construction operations and site conditions <br />Consultant Deliverables <br />Phase 1 -Preliminary Design <br />• Topographical survey - 2 sets; using City's standard borders; <br />• Preliminary improvement plan (location 1 & 2) - 3 sets; on City's standard borders; <br />Phase 2 - 70% Design <br />Sanitary Sewer Pipeline Replacements 2007-08 Dec 21, 2007 <br />Project No. 07-593-52-211 Page 16 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.