My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2008 Freyer & Laureta Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2008
>
Agmt 2008 Freyer & Laureta Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2008 11:05:29 AM
Creation date
2/22/2008 11:05:29 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
2/19/2008
Retention
PERM
Document Relationships
Reso 2008-018
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Plans - indicating locations and types of repair/rehabilitations; onsite improvements <br />to be protected or restored to pre-construction condition; City Standard Plans <br />• Technical Specifications - 3 sets; prepared in the City's standard format using MS <br />Word format <br />• Cost Estimate- estimated cost of construction broken down into standard bid items for <br />all elements shown on the plans <br />Phase 3 - 100% Design <br />• Development of all items listed in Phase 2 above, incorporating City comments from <br />70% review <br />Phase 4 -Final Design <br />• Plans - 1 set incorporating City comments from 100% review, provided on mylar of <br />vellum, wet stamped & signed plus 1 set in AutoCAD 2000 format on CD ; <br />• Technical Specifications plus bid item list - 1 set, incorporating City comments from <br />100% review provided as a hard copy plus 1 electronic copy in MS Word format <br />• Final Cost Estimate- estimated cost of construction broken down into standard bid <br />items for all elements shown on the plans <br />City Deliverables <br />• Copies of documentation allowing access onto each individual private property <br />• CCTV data of sewer inspections <br />• 70% review comment <br />• 100% review comments <br />Schedule <br />• Topographical Survey and conceptual <br />repair plan of locations 1 & 2 6 weeks <br />• City review period 2 weeks <br />• 70% Design Submittal 4 weeks <br />• City review period 2 weeks <br />• 100% Design Submittal 2 weeks <br />• City review period 1 week <br />• Final Design Submittal 1 week <br />Total 18 weeks <br />Sanitary Sewer Pipeline Replacements 2007-08 Dec 21, 2007 <br />Project No. 07-593-52-211 Page 17 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.