Laserfiche WebLink
_..__, iuu. iau r. b <br />Adopted 7/76/ZOOi - E~eetiva 8/i5/200i' <br />(with amendments as of Janaary 2006 City of San Lesndro Zoning Code - Arttaie 24 <br />as to the actual condition, remedy, or cause of deterioration, the burd <br />that of the applicant. en ~ proof shall be <br />A. Ph si I E ements Re ort. A report on the physical elements of alt structures end <br />facilities shall be submitted, containing the following: <br />1. A report by a Calffomia-licensed structural or civil engineer de <br />the structural condition, useful Iffe, and any apparent defeirrled <br />mairrtenance of ail elements of the ro e <br />to, foundations, P P rty, including, but not limited <br />electricity, plumbing, utii~ies, walls, cellln s, <br />frames, recreational facilities, sound transmissions of each building, <br />mechanical equipment, parking facilities, fire <br />facil~ies, and parking conditions and potential problems. 3u hrere~® <br />~, also shall describe the condition of refuse disposal facilities; swimmpnrt <br />pools, saunas, and fountains; stone and brickwork; fireplaces; and <br />exterior lighting. <br />Z. A report by a Cafifomia-licensed appliance repair contractor detailin <br />the age, condition, expected size, and the cost of replacement fog <br />each appliance and mechanical equipment for heating and coolin . <br />The report shall identify any defective or unsafe appliances and set <br />forth the proposed corrective measures to be employed. <br />3. A report by a Califomla-licensed structural termk® and pest control <br />specialist certifying whether or not all attached or detached structures <br />are free of inf®station and sbvc~ura,i damage caused by pests and d <br />rot. The report shall describe what procedures wrouid be necessary o <br />eliminate infestation or damage, if present. Such report shall be <br />updated within six (6) months after the dose of escrow, and an <br />infestation shall be remedied prior to sale, y <br />. 4. Existing soils reports -s#aii be submitted for review with a statement <br />regarding any known evidence of soils problems relating to the <br />structures. <br />5. A report by a Caiifomia-licensed painting contractor verifying the <br />condition of the painting throughout the project, inducting building <br />interior and exterior surfaces, and an estimate of the remaining <br />^•• physical life of the paint. A statement that new paint will be appiled on <br />ail ~buildiny •ir;tado; and c%t:erict ~~rfGcMa may talcs the piece of such <br />report, Such statement shall include the brand name of the paint and <br />the exterior colors to be used. <br />G. A report by a Califomia,licensed roofing contractor verifying the <br />condition of the roofs of all structures and an estimate of the remaining <br />AR.24 <br />Page 5 of 17 <br />~; <br />