Laserfiche WebLink
Applicable General Plan Policy <br />• Policy 50.01 --Access to senior services should be improved through planning, advocacy, and <br />the use of City resources to address identified needs <br />Action 5.01-A Develop a senior center <br />Permits and/or Variances Granted <br />• This project is consistent with zoning for the area as well as the East 14th South Area <br />Development Strategy <br />• No variance is anticipated <br />Environmental Review <br />• The project is categorically exempt <br />Code Compliance Review <br />• A City of San Leandro Building Permit will be obtained for this work <br />• An encroachment permit will be obtained for work on East 14th Street within the Caltrans <br />right-of-way <br />• A permit will be obtained from the Alameda County Flood Control for connection to its <br />storm drain <br />Board/Commission FindinlIs <br />• The Senior Commission provided input on the conceptual design and will continue to <br />participate as the project progresses <br />• A general update on this project was given to the JPA RAC on November 15, 2006 <br />Summary of Public Outreach Efforts <br />• Two community meetings were held as part of the needs assessment and conceptual design <br />phase; input was solicited on site selection and building/program features <br />• No further public meetings are anticipated <br />Fiscal Impact <br />• This action will have no fiscal impact on the City <br />• The cost for the traffic signal and equipment is included in the cost of the Phase 1 <br />improvements currently in construction <br />• Caltrans will maintain the signal and equipment at no cost to the City <br />• Projected project costs to date are $5,538,000, which includes land acquisition, consultant <br />design fees for the complete project and construction of Phase 1 improvements <br />• Phase 2 building construction will be funded separately <br />• The Public Works Department estimated that the Phase 1 improvements will increase annual <br />maintenance costs by $27,250 <br />• Maintenance costs for the parking lot on 13889 East 14th Street will be shared between the <br />District and the City <br />