<br />TITLE 6, Chapter 4
<br />. .. .. .........
<br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SI -MC), San Leandro Administrative Code (SLAC) or the general laws of the State of California.
<br />and Spec
<br />to Permit
<br />nt
<br />ring & Transportation
<br />it Item 9, Public Work Projects
<br />NOTE: FEES FOR BUILDING PERMITS AND TERMITE REPAIR WORK DO NOT INCLUDE THE STRONG MOTION (EARTHQUAKE)
<br />INSTRUMENTATION PROGRAM (S.M.I.P.) FEE MANDATED BY THE STATE OF CALIFORNIA AND COLLECTED BY THE CITY FOR THE
<br />sSTATE. THIS FEE MUST BE ADDED TO THE PERMIT FEES.
<br />A Issuance Fee�7RipiusG-16'aiioonfee , as
<br />_under "Total Valuation"
<br />... . .... ... .. ------
<br />Minimum fee for one inspection 456.00
<br />Building Permits requiring more than one inspection, other than $127.00
<br />for those requiring return inspections for corrections from a
<br />ave a minimum fee of:
<br />___p�reiousJnspe1`ct.i,on, h Ate,PY,. . .......... . .
<br />All-inclusive Permit: Work involving a combination of building One issuance fee plus, One permit fee
<br />and/or mechanical, electrical and plumbing, with a value of less plus, Items from respective fee tables
<br />than $3,000:
<br />(Note: The Building Official may adjust the plan checking/permit fee for an individual project when costs to the City are not congruent with this
<br />fee Schedule.)
<br />Total Valuation: (Based on total value of all construction work, as
<br />Fees
<br />determined by the Building Official, including all finish work, roofing,
<br />f
<br />electrical, plumbing, heating, air conditioning, elevators, fire -
<br />extinguishing systems and any other permanent equipment-) . .....
<br />,
<br />'i
<br />. ... .
<br />From - To and' In-c-lu"d nq
<br />$56.00 ......... .
<br />---------- -
<br />$501.00 - $�J660".'o—o-'
<br />- - ... .
<br />0`6 — for "t'he firs -t`-$5-0 0 plus $ 6.42 for
<br />each addiftional $100 or fraction thereof,
<br />to and including $2,000
<br />$2,001.00 - $50,000.00$152.00
<br />for the first $2,000 plus $12.52
<br />for each additional $1,000 or fraction
<br />thereof, to and including $50,000,00
<br />,$50,001.00 - $100,000.00
<br />. ........ .. ...... .. ..... . ...
<br />3�.60 for the first $50,000 plus $8.73
<br />for each additional $1,000 or fraction
<br />'thereof, to and including $100,000.00
<br />. . . . ...... ........
<br />$1,190.00 for the first $100,000 plus
<br />,$5.00 for each additional $1,000 or
<br />fraction thereof, to and including
<br />$500,000.00
<br />$500,001,00 - $1,000,000.00
<br />... ....... .. ......
<br />$3,190.00 for the first $500,000 plus
<br />i$4.69 for each additional $1,000 or
<br />fraction thereof, to and including
<br />$1,000,000.00
<br />,000,001 .00 and up
<br />$5,532.00 for the first$ 1,000,000 plus
<br />;$3.89 for each additional $1,000 or
<br />fraction thereof
<br />.. . ......... ---- B. Termite Repair Work
<br />$27.00 plus total valuation as listed above
<br />$0.00 - $3,000
<br />.. . ...... ....... . ..... - - -------- .. ... . . ............ . - . .....
<br />$127.00
<br />x$127.00
<br />$3,000
<br />. ... ............ . ..... . .. . ... ..... ......... .
<br />Same as for other permits,
<br />buildingOver
<br /><minimum of $127.00
<br />I GAFEES\2008-09 FeesTee Schedule 3 4/30/2008