Laserfiche WebLink
"'&E — , . ....... <br />.. . . ... ... <br />ATIVE <br />. . .. . .......... ....... ....FEES......... <br />TITLE 6, Chapter 4 <br />. .. .. ......... <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SI -MC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />and Spec <br />to Permit <br />nt <br />ring & Transportation <br />it Item 9, Public Work Projects <br />NOTE: FEES FOR BUILDING PERMITS AND TERMITE REPAIR WORK DO NOT INCLUDE THE STRONG MOTION (EARTHQUAKE) <br />INSTRUMENTATION PROGRAM (S.M.I.P.) FEE MANDATED BY THE STATE OF CALIFORNIA AND COLLECTED BY THE CITY FOR THE <br />sSTATE. THIS FEE MUST BE ADDED TO THE PERMIT FEES. <br />A Issuance Fee�7RipiusG-16'aiioon­fee , as <br />_under "Total Valuation" <br />... . .... ... .. ------ <br />Minimum fee for one inspection 456.00 <br />Building Permits requiring more than one inspection, other than $127.00 <br />for those requiring return inspections for corrections from a <br />ave a minimum fee of: <br />___p�reiousJnspe1`ct.i,on, h Ate,PY,. . .......... . . <br />All-inclusive Permit: Work involving a combination of building One issuance fee plus, One permit fee <br />and/or mechanical, electrical and plumbing, with a value of less plus, Items from respective fee tables <br />than $3,000: <br />(Note: The Building Official may adjust the plan checking/permit fee for an individual project when costs to the City are not congruent with this <br />fee Schedule.) <br />Total Valuation: (Based on total value of all construction work, as <br />Fees <br />determined by the Building Official, including all finish work, roofing, <br />f <br />electrical, plumbing, heating, air conditioning, elevators, fire - <br />extinguishing systems and any other permanent equipment-) . ..... <br />, <br />'i <br />. ... . <br />From - To and' In-c-lu"d nq <br />$56.00 ......... . <br />---------- - <br />$501.00 - $�J660".'o—o-' <br />- - ... . <br />0`6 — for "t'he firs -t`-$5-0 0 plus $ 6.42 for <br />each addiftional $100 or fraction thereof, <br />to and including $2,000 <br />$2,001.00 - $50,000.00$152.00 <br />for the first $2,000 plus $12.52 <br />for each additional $1,000 or fraction <br />thereof, to and including $50,000,00 <br />,$50,001.00 - $100,000.00 <br />. ........ .. ...... .. ..... . ... <br />3�.60 for the first $50,000 plus $8.73 <br />for each additional $1,000 or fraction <br />'thereof, to and including $100,000.00 <br />. . . . ...... ........ <br />$1,190.00 for the first $100,000 plus <br />,$5.00 for each additional $1,000 or <br />fraction thereof, to and including <br />$500,000.00 <br />$500,001,00 - $1,000,000.00 <br />... ....... .. ...... <br />$3,190.00 for the first $500,000 plus <br />i$4.69 for each additional $1,000 or <br />fraction thereof, to and including <br />$1,000,000.00 <br />,000,001 .00 and up <br />$5,532.00 for the first$ 1,000,000 plus <br />;$3.89 for each additional $1,000 or <br />fraction thereof <br />.. . ......... ---- B. Termite Repair Work <br />$27.00 plus total valuation as listed above <br />$0.00 - $3,000 <br />.. . ...... ....... . ..... - - -------- .. ... . . ............ . - . ..... <br />$127.00 <br />x$127.00 <br />$3,000 <br />. ... ............ . ..... . .. . ... ..... ......... . <br />Same as for other permits, <br />buildingOver <br /><minimum of $127.00 <br />I GAFEES\2008-09 FeesTee Schedule 3 4/30/2008 <br />