Laserfiche WebLink
7/1/2008 <br />Current Practices: <br />Pavement <br />Reconstruction <br />o Overlay with asphalt pavement <br />o Replace select damaged asphalt areas <br />o Remove a specific depth o#.asphalt <br />(typically 4") and replace, adding a <br />reinforcing grid <br />o Excavate the entire roadway sectior~,,'~ <br />and completely reconstruct the stet <br />section <br />Cost of Materials <br />o Loss of local material sources require <br />importation~from elsewhere <br />o Delivery trucks congest roadways, add <br />pollution, and dam4ge streets <br />o The impacts of the cosf t~f,oil on <br />products, delivery, and coristruction <br />o A product that costs $1.30 a tarl~~vhen it' <br />loaded on a truck, costs about $1l~gf~r <br />it has been transported just 30 miles' <br />2 <br />