Laserfiche WebLink
BID SUMMARY <br />~ s~ (~~. <br />`?~ <br />:---,; : - <br />a. <br />t~ha.. kI' <br />~. <br />y.f~ <br />~~-k •" <br />~'•'.~.! <br />~u <br />PROJECT TITLE: San Leandro Senior Community Center -Phase 2 <br />PROJECT NO.: 06-210-18-116 <br />BID NO.: N!A <br /> BID OPENING ENGINEER'S ESTIMATE Jeff Luchetti Const. Inc. Menghetti Construction Cal-Pacific Construction, Inc. <br /> DATE: Tuesday, July 22, 2008 Date Approved: 5129!2008 131 Stony Circle, Ste. 300 5272 Jerusalem Ct., Ste. A 1009 Terra Nova Boulevard <br /> TIME: 3:00 PM Prepared by: MG Santa Rosa, CA 95401 Modesto, CA 95356 Pacifica, CA 94044 <br />LOCATION: City Clerk Phone:707-527-5788 Phone:209-524-2465 Phone:650-557-1238 <br /> Fax: 707-542-7718 Fax: 209-524-2495 Fax: 650-557-1239 <br />ITEM <br />NO. QUANTITY ITEM UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST <br />1 1 LS Furnish all material, equipment $10,957,000.00 $10,957,000.00 $11,432,000.00 $11,432,000.00 $11,483,000.00 $11,483,000.00 $11,370,000.00 $11,370,000.00 <br /> and labor to construct the work <br /> shown on the plans for <br /> specifications. <br />2 1 LS Fumish all Sheeting Shoring and $5,000.00 $5,000.00 $0.00 $0.00 $1,000.00 $1,000.00 $65,000.00 $65,000.00 <br /> Bracing as required <br />3 16 Mo Labor compliance per Section $2,000.00 $32,000.00 $150.00 $2,400.00 $1,000.00 $16,000.00 $20,000.00 $320,000.00 <br /> 00700-7.2J <br /> TOTAL BASE BID: $10,994,000.00 $11,434,400.00 $11,500,000.00 '"' <br /> SUBCONTRACTORS: Denalect Peak Ron Backhoe Svr. <br /> R&R Maher Ehler JJ Albanese <br /> Amberwood Land Avavo David Lopez <br /> Calhoun Red Roots Umo Steel <br /> Green Growth Galletti Orson Mechanical <br /> BT Mancini Fitted by Design Speedy Plumbing <br /> Galleti & Sons BT Mancini Kim's Flooring <br /> Davison Watson Good Samaritan West <br /> Anning Johnson Amberwood Armkea <br /> Robbins Arcade JIP Ink <br /> Drapery Concepts PCI f2P Coating <br /> AICaI Glass Man Quality Tile <br />Bid Summary_Senior Center Phase 2_07-22-08 (2).xls Page 5 of 8 Printed 7!23/2008 @ 3:17 PM <br />