My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2008 Cliff Hammond Construction Inspection
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2008
>
Agmt 2008 Cliff Hammond Construction Inspection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2008 5:06:06 PM
Creation date
9/22/2008 3:15:29 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
9/15/2008
Retention
PERM
Document Relationships
_CC Agenda 2008 0915
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2008\Packet 2008 0915
Reso 2008-118
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />COMPENSATION SCHEDULE <br />Compensation for the scope of work as described in Exhibit A shall be on a Time and Materials <br />basis. Work shall be performed on an hourly basis. The scope of work shall expand or contract <br />as necessary during the course of construction as directed by the City. <br />Hourly Rate: <br />Certified DSA Inspector of Record-- $95.00/hr; <br />Total cost shall be on a "Not to Exceed" basis of $215,000 unless otherwise authorized <br />by an approved change order from the City. <br />Notes: <br />1. The proposed rate is per inspector with a 4-hour minimum per site visit. <br />2. Premium rate for holiday, weekend, or night work shall be at the rate of 1.5 times the <br />hourly rate ($142.50 per hour) <br />CSA between City of San Leantlro and Cliff Hammond Construction Inspection Project No. 210-18-116 <br />San Leandro Senior Center -Phase 2 Exhibit B Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.