Laserfiche WebLink
<br />Other Issues <br />Adjacent structures <br />Wells Fargo Building, 101 Callan <br />Santos Robinson Mortuary wdh driveway access <br />.Church parking bt wdh through access <br />Impact [o west view windows at the mortuary <br />Currentty the windows are above the parking structure <br />- Temporary panting during demolitbn and constructbn <br />Noise, Dust and Construction Traffic in Downtown <br />--•- Measures will be taken to minimize the impacts, but they <br />cannot be eliminated <br />~= Leadership in Energy and Environmental Design (LEED) <br />Study feasibildy of compliance with Green Building <br />standards <br />Schedule Outline <br />Design Development <br />June 2008 -October 2008 <br />Demolition and Construction Documents <br />October 2008 -February 2009 <br />Plan Check and Permitting <br />February 2009 -March 2009 <br />Demolition <br />Summer 2009 <br />~~ Construction <br />Eighteen Month construction period (estimated) <br /> <br />