Laserfiche WebLink
EXHIBIT B <br />COMPENSATION SCHEDULE <br />B-1 Compensation Schedule <br />All work will be billed on aTime-and-Materials/Not-to-Exceed basis in accordance with the task <br />breakdown below: <br />Task Description Fees <br /> Belden Architectural Structural Acoustical Task Totals <br />Task 1 Existing Conditions $7,600 $1,200 $2,000 $2,000 $12,800 <br /> & Data Gatherin <br />Task 2 Central Equipment $18,303 $600 $2,000 $1,000 $21,903 <br /> Desi n 30% level <br />Task 3 HVAC Unit Design $20,703 $1,200 $3,000 $1,000 $25,903 <br /> 30% level <br />Task 4.1 Contract Documents $46,606 $1,200 $4,000 $1,400 $53,206 <br /> 60% level <br />Task 4.2 Contract Documents $48,006 $1,700 $4,000 $2,000 $55,706 <br /> 100% level <br />Task 4.3 Contract Documents $33,782 $1,700 $4,000 $2,000 $41,482 <br /> Final <br />Task 5 Bid Process $8,000 $600 $1,000 $600 $10,200 <br />Task 6 Construction $24,000 $1,200 $5,000 $2,000 $32,200 <br /> En ineerin <br /> TOTAL FEE $207,000 $9,400 $25,000 $12,000 $253,400 <br /> PROPOSED <br />Prime consultant's fees indicated include mark-upon sub-consultant's fees. <br />Any additional services beyond those detailed in Exhibit A shall be pre-approved in writing and shall will be <br />provided on either an hourly fee basis per the fee schedule shown on Exhibit D or a mutually agreed upon <br />lump sum fee. <br />Consulting Services Agreement between Project No.: 210-18-130 <br />City of San Leandro and Belden Consulting Engineers --Exhibit B Page 20 <br />