Laserfiche WebLink
San Leandro High School 9th Grade Campus <br />Potential City Cost Sharing Items <br />12/5/2007 <br />Item <br />SLUSD Project Cost <br />Estimated Land <br />Value $60/s <br />Total <br />City Share <br />Percentage <br />City Share <br />Upgrade Exterior <br />Gym Building 6,400 sf <br />176,490 <br />2,886,720 <br />Cid Estimated Cost <br />- <br />384,000 <br />176,490 <br />3,270,720 <br />100%° <br />50% <br />_176,490 <br />1,635,360 <br />Curb and Gutter 138th Av and Bancroft 710 If <br />44,730 <br />- <br />44,730 <br />100% <br />44,730 <br />10 ft sidewalk 138th Ave and Bancroft 7,100 sf <br />129,220 <br />- <br />129,220 <br />100% <br />129,220 <br />Asphalt Improvements for drop off area 2,500 <br />sf <br />35,000 <br />150,000 <br />185,000 <br />100% <br />185,000 <br />Asphalt Improvements for 138th widening 500 <br />sf <br />7,000 <br />30,000 <br />37,000 <br />100% <br />37,000 <br />Corner Reconfiguration at 138th and E 14th St <br />Curb gutter 50 If, walk 500,ramp, signal <br />Modification, (work performed by Senior Center <br />Phase 1) <br />36,050 <br />13,500 <br />49,550 <br />100% <br />— 49,550 <br />Total <br />1 3,892,710 <br />1 <br />2,257,350 <br />