My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2008 Carollo Engineers Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2008
>
Agmt 2008 Carollo Engineers Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2008 3:37:41 PM
Creation date
11/18/2008 3:29:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/3/2008
Retention
PERM
Document Relationships
_CC Agenda 2008 1103
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2008\Packet 2008 1103
Reso 2008-137
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 2.1 -Quality Control Review. Consultant shall perform in-house peer review of final design <br />deliverables before submitting them to the City. The key deliverables that will be peer reviewed by the <br />Consultant's Quality Management Team include the 50 percent, 90 percent, and 100 percent submittals, <br />final geotechnical report, construction sequencing schedule, construction sequencing diagram, and <br />construction cost estimates. <br />Information andlor Services Provided by City: <br />• None. <br />Consultant Deliverables: <br />• Letter acknowledging completion of quality control review of deliverables outlined in this task by <br />Consultant's Quality Management Team. <br />Task 2.2 -Construction Drawings and Specifications. Consultant shall prepare drawings on a computer <br />aided design and drafting (CADD) system using Consultant's CADD drafting standards. Construction <br />drawings will include disciplines in the areas of general, architectural, demolition, civil, structural, <br />mechanical, HVAC, electrical, and instrumentation. <br />Consultant shall incorporate City-prepared Front End Specifications (including General Conditions and <br />Special Conditions) with Consultant's Technical Specifications using Construction Specifications Institute <br />Divisions 1-17 format for bidding packages from Consultant's Standard Specifications, modified as <br />necessary to suit project needs. <br />The key project elements listed herein have been assumed for final design since Predesign has not yet <br />been completed. The scope and complexity of these elements are subject to change depending the final <br />recommendations of the Predesign Report. <br />1. New Headworks - Provide a new headworks with three screens (climber or fine <br />screens) and one vortex grit tank. Screw conveyor(s) will be used to convey the screenings to <br />washer/compactor(s) for disposal in a screenings bin. Grit will be conveyed via grit pump(s) to <br />washer/cyclone(s) for dewatering before disposal in a grit bin. The new headworks will be <br />located east of the existing headworks, which will be abandoned. <br />2. New Influent Pump Station - Provide a new influent pump station with aself-cleaning <br />trench-type wet well design. Four vertical or submersible pumps will be provided for the pump <br />station. The new pump station will be located near the new headworks and will be configured <br />either before the new headworks, before the new grit tank, or after the new grit tank. The <br />existing influent pump station will be abandoned. <br />3. New Primary Clarifier - Provide a new 70-foot diameter circular primary clarifier with a side <br />water depth of 11 feet at the same location as the existing rectangular primary sedimentation <br />basins, which will be demolished. The new clarifier will be center-fed and have perimeter <br />launders similar to the two existing primary clarifiers. <br />4. Existing Primary Clarifiers 1 and 2 Improvements -Provide the following improvements to <br />existing Primary Clarifiers 1 and 2: a) installation of walkways with handrails, gratings, and <br />wash water manifold at effluent launders; b) provide additional primary effluent samplers; c) <br />Consulting Services Agreement between Project No. 08-593-52-239 <br />City of San Leandro and Carollo Engineers, Inc. Page 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.