My WebLink
|
Help
|
About
|
Sign Out
Home
ShorelineMarina Highlights 2008 1118
CityHall
>
City Clerk
>
City Council
>
Committees
>
Shoreline-Marina Committee
>
ShorelineMarina Highlights 2008 1118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2008 5:11:57 PM
Creation date
11/26/2008 5:11:57 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
11/18/2008
Retention
PERM
Document Relationships
_CC Agenda 2008 1201
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2008\Packet 2008 1201
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dredging Alternatives <br />No Dredging <br />^ Closure of the Marina <br />^ Closure of the boat launch ramp <br />^ COE dredge project abandoned <br />^ Harbor and channel will continue to silt <br />^ No future cost to remove dredge material <br />from DMMS <br />^ Future cost to remove improvements from <br />harbor <br />^ Future costs to return DMMS to wetlands <br />Dredging Alternatives <br />Full Dredging <br />^ Federal Channel dredged to past depths <br />^ All facilities capable of remaining open <br />^ COE does not have sufficient funds for full <br />dredge and does not permit supplemental <br />funding by City <br />^ City cost for full dredge including berthing <br />area 310K CY $ 3.5M <br />^ Material removal to Oyster Bay Park $7M <br />^ Next dredge cycle costs range from $4.9M to <br />$7.3M depending on disposal location <br />Dredging Alternative <br />Modified Dredging <br />^ Boat launch ramp to remain open <br />^ Harbor converted to small boat marina <br />^ 2009 dredging funded by COE <br />^ Future material removal (85K CY) by City <br />$2M disposed at Oyster Bay Park <br />^ Future maintenance dredging on a 4 year <br />cycle to maintain approximately 69% yearly <br />access to launch ramp by trailerable boats <br />(50,000 CY) <br />^ Future year maintenance dredging costs <br />including removal $2.2M - $3.7M <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.