Laserfiche WebLink
PROJECT TITLE: Washington Ave improvements Project <br />PROJECT NO.: 08-144-39-007 & OS-150-38-a74 <br />BID NO.: N/A <br />DATE: Tuesday, December 16, 2008 <br />TIME: 3:00 PM <br />LOCATION: City Clerk <br />ITEM <br />NO. QUANTITY ITEM <br />12 4 EA Remove Roadside Sign <br />13 1 LS Check, Relocate and Maintain <br />Irrigation Faalfies <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />8 EA Relopte Road Sign !, <br />1 EA Adjust Frame and Grate to <br /> Grade <br />1 FA Adust Survey Monument Frame <br /> and Cover to Grade <br />4 EA Adjust Storm Water Manhole <br /> Frame and Cover to Grade <br />10 EA Adjust Sanitary Sewer Manhole <br /> Frame and Cover to Grade <br />2 EA Adjust PacBell (ATBT) Manhole <br /> Frame and Cover to Grade <br />11 EA Adjust EBMUD Water Valve Pot <br /> to Grade <br />3 F.A Adjust Gas Valve Pot to Grade <br />8 EA Reset Redflex Traffic Detector <br /> Loops <br />180 SF Cold Plane AC Pavement <br />1 LS Remove Concrete (Curb, Gutter <br /> and Sidewalk) <br />1 LS Clearing and Grubbing <br />4,470 CY Roadway Excavation (Final <br />ENGINEER'S ESTIMATE Bay Cities PavingB~Grading,inc. OC Jones 8~ Sons, Inc <br />ate Approved: 1215(2008 5029 Fomi Drive 1520 Fourth Street <br />13pared by: KL Con~rd, CA 94520 Berkeley, CA 94710 <br />Phone: 925-687-6666 Phone:510-526-3424 <br />Fax: 925-687-2122 Fax:510-526-0990 <br />IT COST ITEM COST UNIT COST ITEM COST <br />UNIT COST ITEM COST UN <br />00 <br />150 <br />$80.00 $320.00 $153.00 $612.00 . <br />$ <br />$1,000.00 $1,000.00 $15,570.00 $15,570.00 $5,000.00 <br />$350.00 $2,800.00 $204.00 $1,632.00 $200.00 <br />$1,200.00 $1,200.00 $561.00 $561.00 $3,000.00 <br />$1,200.00 $1,200.00 $561.00 $561.00 $550.00 <br />$1,500.00 $6,000.00 $969.00 $3,876.00 $950.00 <br />$1,500.00 <br />$1,900.00 <br />$650.00 <br />$1,200.00 <br />$800.00 <br />$10.00 <br />$40,000.00 <br />$20,000.00 <br />$45.00 <br />Bid Summary- Washington Ave Improvements 12-16-Oe.xlsx <br />f $15,000.00 <br />$3,800.00 <br />$7,150.00 <br />$3,600.00 <br />$6,400.00 <br />$1,800.00 <br />$40,000.00 <br />$20,000.00 <br />$201,150.00 <br />$969.00 <br />$1,275.00 <br />$561.00 <br />$561.00 <br />$438.00 <br />$16.00 <br />$31,000.00 <br />$15,800.00 <br />$25.85 <br />$9,690.00 <br />$2,550.00 <br />$6,171.00 <br />$1,683.00 <br />$3,504.00 <br />$2,880.00 <br />$31,000.00 <br />$15,800.00 <br />$115,549.50 <br />Page 2 of 16 <br />Granite Rock Construction <br />120 Granite Rodc Way <br />San Jose, CA 95136 <br />Phone: 408-5741400 <br />Fax:408-365-8349 <br />UNIT COST ITEM COST <br />$5,000.00 $15,263.00 $15,263.00 <br />$1,600.00 $275.00 $2,200.00 <br />$3,000.00 $3,100.00 $3,100.00 <br />$550.00 $550.00 $550.00 <br />$3,800.00 $950.00 $3,800.00 <br />$9,500.00 $950.00 $9,500.00 <br />$1,250.00 $2,500.00 <br />$550.00 $6,050.00 <br />$550.00 $1,650.00 <br />$1,500.00 $12,000.00 <br />$10.00 $1,800.00 <br />$38,000.00 $38,000.00 <br />$12,000.00 $12,000.00 <br />$38.00 $169,860.00 <br />$1,250.00 $2,500.00 <br />$550.00 $6,050.00 <br />$550.00 $1,650.00 <br />$810.00 $6,480.00 <br />$15.00 $2,700.00 <br />$33,000.00 $33,000.00 <br />$17,800.00 $17,800.00 <br />$37.00 $165,390.00 <br />Printed 1 2/1 712 0 0 8 ~ 10:09 AM <br />