My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2009 0217
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2009
>
Packet 2009 0217
>
8E Consent 2009 0217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2009 10:04:52 AM
Creation date
2/13/2009 10:04:52 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
2/17/2009
Retention
PERM
Document Relationships
_CC Agenda 2009 0217
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2009\Packet 2009 0217
Reso 2009-024
(Reference)
Path:
\City Clerk\City Council\Resolutions\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN LEANDRO <br />STAFF REPORT <br />DATE: February 17, 2009 <br />TO: Stephen L. Hollister, City <br />FROM: Uchenna Udemezue, Director <br />Engineering and Transportatic <br />BY: Kenneth Joseph, City Engineer <br />Engineering and Transportatio Depa ent <br />SUBJECT PROJECT/PROJECT DESCRIPTIO <br />APPROVED AND <br />FORWARDED <br />TO CITY COUNCIL <br />Stephen L. Hollister <br />City Manager <br />RESOLUTION ACCEPTING THE WORK FOR THE SAN LEANDRO SENIOR CENTER, <br />PHASE 1, PROJECT NO. 210-18-116 <br />SUMMARY AND RECOMMENDATION <br />Staff recommends acceptance of the work, filing of the Notice of Completion, and authorizing <br />the City Manager to release the maintenance bonds for the subject project upon successful <br />completion of the one-year maintenance period. <br />BACKGROUND <br />The Senior Center project is being constructed in two phases because of funding limitations and <br />contractual obligations. Phase 1 includes construction of a parking lot on the former Ford <br />property. This parking lot will be used by hospital and medical office patrons and shared <br />parking for the senior center. <br />Analysis <br />The completed Phase 1 improvements consisted of: <br />• Removal and demolition of former auto dealership site at 13889 East 14th Street (note <br />that the building removal was completed under a separate contract) <br />• 172-space main parking lot and entry roadway <br />• Traffic signal at the entry road (138th Avenue and East 14th Street) and East 14th Street <br />improvements within Caltrans' right-of--way <br />• Landscape improvements <br />• Joint Senior Center/San Leandro Hospital monument sign <br />Construction of Phase 1 is substantially complete with the exception of a few corrective items <br />that are currently being completed. Monies from the retention held by the City will continue to <br />
The URL can be used to link to this page
Your browser does not support the video tag.