Laserfiche WebLink
Project History <br />• Studies to construct Soundwalls began in 1989. Project shelved in the <br />1990's due to budget constraints <br />• With the suppo~ of the ACCMA and the City of San Leandro, the Noise <br />Barrier Scope Summary Report (NBSSR} was funded and completed in <br />June 2001 <br />• 10 Soundwalls were originally proposed; Soundwall along the east side <br />of I-580, between Grand Avenue and Daily Drive was eliminated at the <br />request of residents. Elimination of this wail was affirmed by the San <br />Leandro City Council in March 2002 <br />