Laserfiche WebLink
Cost Breakdown-Scribner Center <br />item <br />Design 8 Engineering <br />Permits <br />Temp. Services <br />Demolition ~ Off haul <br />Saw Cutting <br />New Concrete <br />New 6" Concrete Curb <br />Columns w/Stone-Free Standing <br />Columns w/Stone-Against Walls <br />Planters Under Windows <br />TreNis <br />Urns <br />Iron Fencing <br />Electrical <br />Light Fixtures <br />Outdoor Heaters <br />New Doors <br />Landscaping <br />Stripe Parking Lot t4~ Repairs <br />Remodel Planter ~ Monument <br />Painting <br />Misc, Labor, Overhead 8 Profit <br />Contingencies 3% <br />Total <br />Description Quanti Total <br />Design work, plans and structural engineering $25,000.00 <br />Required permits from City of San Leandro $1,000.00 <br />Temp. fencing, misc. items $1,200.00 <br />Break out existing concrete & asphalt off haul to dumps $8,640,D0 <br />Cut existing concrete & asphalt $1,950.00 <br />Stamped concrete with color and 24" square pattern w 12" borders $56,640.00 <br />6" concrete curbs for new planter areas in parking !ot 6'wv x 12"h $1,650.00 <br />Cement block columns 16"x 16"x 96" fully wrapped with stucco stone 10 $22,OD0.00 <br />Cement block columns 8"x 16"x 96" wrapped with stucco stone 3-sides 11 $18,700.00 <br />Cement block planter with stone facing, sill and water proofing 3 $12,525.00 <br />Rough sawn cedar attached to top of columns $33,250.00 <br />New Bristol vases w/saucers 33"h x 36"w 9 $5,246.00 <br />New 36"h fencing with 2-36"w gates and 1-double 36" gates 11 D $15,580.00 <br />Wire for 16 new wal! sconces, heaters, provide swikches, all in conduit $4,870.00 <br />Outdoor wall sconces 16 $3,200,00 <br />Hanging electric outdoor rated heaters 6 $3,900.00 <br />Entry dbl door fi'x 8', 2-36"x 8' S1de doors, 1-14'x 8' nano door-labor inc. $35,000.00 <br />New planting, irrigation, drainage, top soil etc.. $15,000.00 <br />New stripping, ADA, patching and signage $3,OOO.OD <br />New stone facing, cap and new sign on monument 1 $5,500.00 <br />Paint Exterior of Englander side and Walt's side 1 $14,fi50.00 <br />Misc. labor, equipment, insurance, overhead, and profit $35,681,28 <br />Misc. labor, association fee's, etc.. $8,975.47 <br />$333,157,75 <br />Optional Driveway Approach Remove and replace driveway approach on western parking lot $9,160.00 <br />