|
Cost Breakdown-Scribner Center
<br />item
<br />Design 8 Engineering
<br />Permits
<br />Temp. Services
<br />Demolition ~ Off haul
<br />Saw Cutting
<br />New Concrete
<br />New 6" Concrete Curb
<br />Columns w/Stone-Free Standing
<br />Columns w/Stone-Against Walls
<br />Planters Under Windows
<br />TreNis
<br />Urns
<br />Iron Fencing
<br />Electrical
<br />Light Fixtures
<br />Outdoor Heaters
<br />New Doors
<br />Landscaping
<br />Stripe Parking Lot t4~ Repairs
<br />Remodel Planter ~ Monument
<br />Painting
<br />Misc, Labor, Overhead 8 Profit
<br />Contingencies 3%
<br />Total
<br />Description Quanti Total
<br />Design work, plans and structural engineering $25,000.00
<br />Required permits from City of San Leandro $1,000.00
<br />Temp. fencing, misc. items $1,200.00
<br />Break out existing concrete & asphalt off haul to dumps $8,640,D0
<br />Cut existing concrete & asphalt $1,950.00
<br />Stamped concrete with color and 24" square pattern w 12" borders $56,640.00
<br />6" concrete curbs for new planter areas in parking !ot 6'wv x 12"h $1,650.00
<br />Cement block columns 16"x 16"x 96" fully wrapped with stucco stone 10 $22,OD0.00
<br />Cement block columns 8"x 16"x 96" wrapped with stucco stone 3-sides 11 $18,700.00
<br />Cement block planter with stone facing, sill and water proofing 3 $12,525.00
<br />Rough sawn cedar attached to top of columns $33,250.00
<br />New Bristol vases w/saucers 33"h x 36"w 9 $5,246.00
<br />New 36"h fencing with 2-36"w gates and 1-double 36" gates 11 D $15,580.00
<br />Wire for 16 new wal! sconces, heaters, provide swikches, all in conduit $4,870.00
<br />Outdoor wall sconces 16 $3,200,00
<br />Hanging electric outdoor rated heaters 6 $3,900.00
<br />Entry dbl door fi'x 8', 2-36"x 8' S1de doors, 1-14'x 8' nano door-labor inc. $35,000.00
<br />New planting, irrigation, drainage, top soil etc.. $15,000.00
<br />New stripping, ADA, patching and signage $3,OOO.OD
<br />New stone facing, cap and new sign on monument 1 $5,500.00
<br />Paint Exterior of Englander side and Walt's side 1 $14,fi50.00
<br />Misc. labor, equipment, insurance, overhead, and profit $35,681,28
<br />Misc. labor, association fee's, etc.. $8,975.47
<br />$333,157,75
<br />Optional Driveway Approach Remove and replace driveway approach on western parking lot $9,160.00
<br />
|