Laserfiche WebLink
City Council- All Selected Projects <br />Council Council Project Project type 2009_2010 Summary Description <br />Ranking Average Number Steering <br />Committee <br />Adjusted <br />Rankin <br />36 3:86 Toyon Park Play 2008.0100 P 25 Put play equipment into the empty play area <br />Equipment <br />37 3.86 Marina Community 2005.0060 B 39 Redesign & construction of store fronton the south side. Current <br />Center Walkway Enclosure store front enclosure allows water from irrigation and rain to leak <br />into facility <br />38 3.43 Washington Manor Park 2003.0320 P 41 This will renovate the entire Manor Park in accordance with the <br />Renovation city Parks Master Plan: <br />39 3.14 Muir Soccer Synthetic Field 2007.0150 P 52 Improve drainage and replace the Muir Soccer Field grass turf with <br />artificial turf <br />40 1.86- Replace Washington 2003.0760 B 1Q3-This project will replace. the existing building used for recreational. <br />Manor Park-Bldg. with- activities with a facility capable of being a community center and <br />Community Center classroom to supportthe community. <br />Tuesday, March 10, 2009 Page 8 of 9 <br />