Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
<br /> <br />Cr~uncil Conn~il Project l'rciect type ~0c9__~C~? 0 8umz7~~tz~~ ~t5c.ri~tic~z~ <br />R~I~ltin ~ <~vF~r~iric i~LtIl~~?~r ~ ~~(,T1Ii~~ <br />~1-10~ C~11~iTllt~ec <br /> ~djll~tct <br /> ~LtI1i~11Ig <br />25 4.'71 PSG Communication 2006.0041 B 13 Construction of new communications center to accommodate the new larger <br /> Room Expansion and additional communication workstations based on design in 200 / 08 <br /> COnstrnct1on Fiscal Year <br />1$ 5.33 Roadway Drainage 2006.0180 R 14 Provides for repair of displaced curb and gutter to rectify gutter ponding <br />Repair (annual) issues. To be included with annual sidewalk program <br />20 5.14 Par Course 2009.0080 P 15 Reconstruction of paved walkways and installation of new exercise station <br />Improvements equipment and signage <br />Pac 1 and Pak 2 2008.00~o P <br />Lleachers <br />Bridge Maintenance 2008.0160 R <br />and Repair <br />16 Removal of three existing bleachers and installation of new code compliant <br />bleachers <br />1~ Make repairs to various city owned bridge structures in conformance with the <br />200 Bridge Inspection Report prepared by P~VS & ET <br />Stenzel Park Bleacher 2003.0680 P 18 This project will replace all bleachers, including removal and disposal of old <br />Renovation bleachers and installation of new aluminum bleachers at Stenzel Park. <br />Tuesday, March 10, 2009 Pale g of ig <br />